ST0301A-SP100908Page 1 of 1 Keith Marvin - Bethel Road Reconstruction - Approved Submittal for Cement TreatedBase Backfill From: Caleb Thornhill <bct(� free se. com> To: Keith Marvin <kmarvin(a coppelltx.gov >, Dean Dumke <deand(a,JRJPaving.com> Date: 9/8/2010 4:52 PM Subject: Bethel Road Reconstruction - Approved Submittal for Cement TreatedBase Backfill CC: "stevegntbridge.com" <stevegntbridge.com >, CPL03243 <CPL03243 gfreese.com >, Chris Poteet <cjpgfreese.com >, Tony Diaz <ADgfreese.com> Attachments: Response to Cement treated base Submittal 7 .pdf Keith /Dean, Cement Treated Base Backfill has been approved. See attached for your reference. B. Caleb Thornhill P.E. Project Manager Freese and Nichols. Inc. w Main - 214- 217 -2200 s Direct - 214- 217 -2282 s Fax 214- 920 -2565 ® Email: bct _,freese.com Please consider the environment before printing this message. This electronic mail message is intended exclusively for the individual or entity to which it is addressed. This message, together with any attachment, may contain the sender's organization's confidential and privileged information. The recipient is hereby notified to treat the information as confidential and privileged and to not disclose or use the information except as authorized by sender's organization. Any unauthorized review, printing, retention, copying, disclosure, distribution, retransmission, dissemination or other use of, or taking of any action in reliance upon, this information by persons or entities other than the intended recipient is prohibited. If you received this message in error, please immediately contact the sender by reply email and delete all copies of the material from any computer. Thank you for your cooperation. file: HC: \Documents and Settings \radloo \Local Settings\ Temp \XPgrpwise \4C87BF65City_... 1/25/2011 Page 1 of 2 Keith Marvin - RE: Bethel Road Reconstruction - Approved Submittal for Cement Treated Base Backfill From: Caleb Thornhill <bct(� free se. com> To: "stevegntbridge.com" <stevegntbridge.com >, Keith Marvin <kmarvingcoppelltx.gov >, Dean Dumke <deand(a,JRJPaving.com> Date: 9/9/2010 4:37 PM Subject: RE: Bethel Road Reconstruction - Approved Submittal for Cement Treated Base Backfill CC: CPL03243 <CPL03243 gfreese.com >, Peter Kau <vbkgfreese.com >, Chris Poteet <cjp(afreese.com> Steve, • The vert bar shown at 5" C -C is in case the screening wall is being added. If we only put a traffic rail on the wall, these can be removed. • Structures is verifying the need for select backfill. I will have a response to you in the morning. • Natural ground is acceptable for the 1ft space beyond the concrete placement • 0", flush, is acceptable B. Caleb Thornhill, P.E. Freese & Nichols, Inc. 214 - 217 -2282 From: steve @ntbridge.com [mailto:steve @ntbridge.com] Sent: Thursday, September 09, 2010 9:25 AM To: Caleb Thornhill Subject: Re: Bethel Road Reconstruction - Approved Submittal for Cement Treated Base Backfill I had questions on your wall modification detail that have not been answered: There is a vert bar shown at 5" ctrs that should be 15 "? See the upper Left Detail There is select backfill shown with no pay item? There is a 1 Ft space beyond the concrete placement that shows select fill? I would propose the concrete to be placed against natural ground maybe (12" min) maybe 15 - 16" from the exist footing. RW2 shows a keyway with a 2x4 placed at the top of the wall footing? It says 0 -2" in Ht. We will place the 2x4 at 0 ", flush with the top of the footing. RW2 We have the reinforcing on site and will begin the modifications Monday September 13 Please clarify so we have no questions on the site Thanks Steve Goodman NTBC - - - -- Original Message---- - From: Caleb Thornhill [ma i Ito: bct@freese.com] Sent: Wednesday, September 8, 2010 05:50 PM To: 'Keith Marvin', 'Dean Dumke' Cc: steve @ntbridge.com, 'CPL03243', 'Chris Poteet', 'Tony Diaz' Subject: Bethel Road Reconstruction - Approved Submittal for Cement Treated Base Backfill file: HC: \Documents and Settings \radloo \Local Setting s\Temp\XPgrpwi se C 8 9 OD 56 City_... 1/25/2011 Page 2 of 2 Keith /Dean, Cement Treated Base Backfill has been approved. See attached for your reference. B. Caleb Thornhill P.E. Project Manager Freese and Nichols, Inc. w Main - 214- 217 -2200 s Direct - 214- 217 -2282 s Fax 214- 920 -2565 ® Email: bct _,freese.com Please consider the environment before printing this message. This electronic mail message is intended exclusively for the individual or entity to which it is addressed. This message, together with any attachment, may contain the sender's organization's confidential and privileged information. The recipient is hereby notified to treat the information as confidential and privileged and to not disclose or use the information except as authorized by sender's organization. Any unauthorized review, printing, retention, copying, disclosure, distribution, retransmission, dissemination or other use of, or taking of any action in reliance upon, this information by persons or entities other than the intended recipient is prohibited. If you received this message in error, please immediately contact the sender by reply email and delete all copies of the material from any computer. Thank you for your cooperation. file: HC: \Documents and Settings \radloo \Local Setting s\Temp\XPgrpwi se\4 C 8 9 OD 56 City_... 1/25/2011 LMC Lattimore Materials Company 15900 DOOLEY ROAD ADDISON TX 75001 (972)221 -4646 (main) (972)221 -9647 (fax) Ready Mix Concrete Mixture Design Date: 09102/10 Client: NORTH TEXAS BRIDGE CO INC Project: BETHEL ROAD & WALLS COPPELL Materials: Cement: ASTM C 150, TYPE 1 /II Fine Agg.: ASTM C 33, CONCRETE SAND Admixtures: ASTM C 260. FLOWABLE FILL 1.0 Cubic yard by weight - SSD Mix dumber Strength @ 28 Days 3741 (2 SK GROUT, FF) 100 psi Cement Fine Aggregate Water Admixture SIKA LITECRETE POWDER Total Weight Unit Weight w /cm Ratio Fly Ash Replacement Maximum Temperature Slump Entrained Air FREESE AND NICHOLS INC. This shop dra%%ing has been reviewed by the Contractor and certified to be in ,Irict conformance with the Contract Documents as mod, tied by addenda, change orders and field orders. Deviations can only be approved by field order or change order. Approval is only for conformance with the design concept of the pr„iect and compliance with the intent of the information given ; the Contract Documents. Contractor is responsible itir dimensions to be confirmed and correlated at the job site, for information that pertains soley to the fabrication processes or to techniques of construction; and for the work of all trades. V pproved 0 Not Approved 13 API? vyd,zs Noted ❑ Re ise a Resin it Date: , —_.��/ �= f/ /,> 13% �; l 1 A C 188 Ibs 2599 Ibs 330 Ibs 1 bag 3117 Ibs 115.44 pcf 1.76 0% 95° F FLOWABLE inches 17 -19% LIVIC has no knowledge or authority regarding where this mixture is to be placed, therefore it is the direct responsibility of the Purchaser, the design architect or design engineer, and or contractor to insure that the above designed mixture parameters for compressive strength, mixture proportions or ratios, and other required performance parameters are appropriate for the anticipated environmental, durability, or usage conditions in ACI 318 Chapter 4 and /or the relevant local building codes. LIVIC warrants the supplied ready -mix concrete mixture designs which LMC guarantees will achieve the specified compressive strength, or other performance properties of the concrete stated in the Contract Documents, as were made available at the time of quotation, when tested and evaluated in accordance with ASTM C172 -99, ASTM C31fC31M -03a (including proper initial curing as per Section 10.1.2), ASTM C39fC39M -01, ASTM C94iC94M -07, or other standard test methods indicated in the Contract Documents that were necessary to verify the additional performance properties of the concrete, and when the recommended procedures for placement and curing of the in -place concrete, or those specifically outlined in ACI 30SR -99 and ACI 306R -88 are followed, if and when necessary. Additional information can be found in the Limited Warranty for Ready Mix Concrete. In accordance with ASTM C94IC94M -07 Section 4.6, Lattimore Materials Company shall receive all copies of testing reports, and they should be forwarded to our Quality Control Department (fax 972 -221 -9647) as soon as available. Failure to forward reports in a fimely fashion can delay response time in dealing with concrete concerns as well as future project submittals. This mix design submittal, price quote, or material specific information (aggregate properties, grading, material composition, or other information regarding materials manufactured by Lattimore Materials Company) is proprietary and confidential and not to be shared or transmitted in any form to any person or organization that is not expressly authorized in writing by a designated official of Lattimore Materials Company. Any unauthorized person or entity in possession of this information will be prosecuted to the fullest extent of the law. 2011) Keith Marvin - RE: FW: Bethel Road Reconstruction - Approved Submittal for ❑Cement Treated Base Backfill Page 1 From: Caleb Thornhill <bct @freese.com> To: Keith Marvin <kmarvin @coppelltx.gov> Date: 9/9/2010 4:00 PM Subject: RE: FW: Bethel Road Reconstruction - Approved Submittal for Cement Treated Base Backfill Got it this morning. Typing a response now On the select fill, the Geotech report says any wall height less than 5' we can use native (natural) material We have a small portion over that. Most of the material actually meets the geotech reports criteria for "select fill ". Peter is running the numbers to see if we can avoid a new bid item for select fill. Should have something first thing in the morning. B. Caleb Thornhill, P.E. Freese & Nichols, Inc. 214 - 217 -2282 - - - -- Original Message---- - From: Keith Marvin [mailto:kmarvin @coppelltx.gov] Sent: Thursday, September 09, 2010 3:56 PM To: Caleb Thornhill Subject: Fwd: FW: Bethel Road Reconstruction - Approved Submittal for Cement Treated Base Backfill Have you seen this email? Keith >>> "Dean Dumke" <deand @JRJ Paving. com> 9/9/2010 3:38 PM >>> Keith, Just saw this email sent to Caleb from Steve, N TX Bridge. Can I get you to push to get these items answered by tomorrow so that we do not have any further hiccups. If select fill is required, we will have to have an additional pay item. I think they were wanting the same natural material we were using before, but that is not what detail shows. Thanks, Dean Dumke Sr Project Manager #469- 223 -7879 J RJ PAVING, L. P. 2011) Keith Marvin - RE: FW: Bethel Road Reconstruction - Approved Submittal for ❑Cement Treated Base Backfill Page 2 From: steve @ntbridge.com [mailto:steve @ntbridge.com] Sent: Thursday, September 09, 2010 11:24 AM To: Dean Dumke Subject: Fwd: Bethel Road Reconstruction - Approved Submittal for Cement Treated Base Backfill - - - -- Original Message---- - From: steve @ntbridge.com [mailto:steve @ntbridge.com] Sent: Thursday, September 9, 2010 10:24 AM To: 'Caleb Thornhill' Subject: Re: Bethel Road Reconstruction - Approved Submittal for Cement Treated Base Backfill had questions on your wall modification detail that have not been answered: There is a vert bar shown at 5 ctrs that should be 15 "? See the upper Left Detail There is select backfill shown with no pay item? There is a 1 Ft space beyond the concrete placement that shows select fill? I would propose the concrete to be placed against natural ground maybe (12" min) maybe 15 -16" from the exist footing. RW2 shows a keyway with a 2x4 placed at the top of the wall footing? It says 0 -2" in Ht. We will place the 2x4 at 0 ", flush with the top of the footing. RW2 We have the reinforcing on site and will begin the modifications Monday September 13 Please clarify so we have no questions on the site Thanks 2011) Keith Marvin - RE: FW: Bethel Road Reconstruction - Approved Submittal for ❑Cement Treated Base Backfill Page 3 Steve Goodman NTBC - - - -- Original Message---- - From: Caleb Thornhill [mailto:bct @freese.com] Sent: Wednesday, September 8, 2010 05:50 PM To: 'Keith Marvin', 'Dean Dumke' Cc: steve @ntbridge.com, 'CPL03243', 'Chris Poteet', 'Tony Diaz' Subject: Bethel Road Reconstruction - Approved Submittal for Cement Treated Base Backfill Keith /Dean, Cement Treated Base Backfill has been approved. See attached for your reference. B. Caleb Thornhill P.E. Project Manager Freese and Nichols, Inc. <http: / /www.freese.com /> * Main: 214 - 217 -2200 * Direct: 214- 217 -2282 * Fax: 214 - 920 -2565 * Email: bct @freese.com Please consider the environment before printing this message. This electronic mail message is intended exclusively for the individual or entity to which it is addressed. This message, together with any attachment, may contain the sender's organization's confidential and privileged information. The recipient is hereby notified to treat the information as confidential and privileged and to not disclose or use the information except as authorized by sender's organization. Any unauthorized review, printing, retention, copying, disclosure, distribution, retransmission, dissemination or other use of, or taking of any action in reliance upon, this information by persons or entities other than the intended recipient is prohibited. If you received this 2011) Keith Marvin - RE: FW: Bethel Road Reconstruction - Approved Submittal for ❑Cement Treated Base Backfill Page 4 message in error, please immediately contact the sender by reply email and delete all copies of the material from any computer. Thank you for your cooperation. This electronic mail message is intended exclusively for the individual or entity to which it is addressed. This message, together with any attachment, may contain the sender's organization's confidential and privileged information. The recipient is hereby notified to treat the information as confidential and privileged and to not disclose or use the information except as authorized by sender's organization. Any unauthorized review, printing, retention, copying, disclosure, distribution, retransmission, dissemination or other use of, or taking of any action in reliance upon, this information by persons or entities other than the intended recipient is prohibited. If you received this message in error, please immediately contact the sender by reply email and delete all copies of the material from any computer. Thank you for your cooperation.