ST0301A-CN100909Page 1 of 1 Keith Marvin - Bethel Road Reconstruction - Knight's Way Driveway From: Caleb Thornhill <bct @ free se. com> To: Keith Marvin <kmarvin @coppelltx.gov> Date: 9/9/2010 3:05 PM Subject: Bethel Road Reconstruction - Knight's Way Driveway CC: CPL03243 <CPL03243 @freese.com> Attachments: 20100909141544.pdf; Traffic Rail Type T80SS.pdf Keith, We've discussed most of the RFI's, and I'm in the process of formalizing the responses. RFI 12 1 wanted to get your input on the revised Knight's Way driveway. I've attached a sketch showing a different curb ramp configuration. The only concern I have is the sidewalk leading to the "tower ". I'm showing an elevation of approximately 8.6 %. It would require two steps to eliminate the steep grade. Call me once you've had a chance to review it the attached sketch. Pajares Screening Wall I've attached an alternate detail for a traffic rail that could have a stone face affixed to the back. There is no issue attaching stone facing to the back of it. B. Caleb Thornhill P.E. Project Manager Freese and Nichols. Inc. w Main - 214- 217 -2200 s Direct - 214- 217 -2282 s Fax - 214- 920 -2565 ® Email: bct _,freese.com Please consider the environment before printing this message. This electronic mail message is intended exclusively for the individual or entity to which it is addressed. This message, together with any attachment, may contain the sender's organization's confidential and privileged information. The recipient is hereby notified to treat the information as confidential and privileged and to not disclose or use the information except as authorized by sender's organization. Any unauthorized review, printing, retention, copying, disclosure, distribution, retransmission, dissemination or other use of, or taking of any action in reliance upon, this information by persons or entities other than the intended recipient is prohibited. If you received this message in error, please immediately contact the sender by reply email and delete all copies of the material from any computer. Thank you for your cooperation. file: HC: \Documents and Settings \radloo \Local Settings\ Temp \XPgrpwise \4C88F7CBCity_... 1/25/2011 U + v v U > o D m o 7 L O + d N N +a+ OO L•_ L 3 C E N 4, O N N + w C 0 0 . U' OPL NC C 7• -•- W IaL+ +— N T 7 O C r N X O O O1 N L F L C oo) ' •- v C L a L H L O +o 0 E X C a Txa a, o U L a T O N90 C L N L 4J ++ oa - > U � wv N L N•- T a •- U ac -v L•-•- L oYn0 a O C U C C O C C C + O O •- N O k N L N O 00 L w L T + 0 C c o 8 0 Nut N o E O K �A37E w 7 N L 7, NZ OQ —C JH L U O N + O Ux+ L o ago Wingwall Length (Variable) Panel Length (24' Min & 33' Max) P Le ngth (24' Min & 33' Max) Panel Length (24' Min & 33' Max) End of Bridge Rail 5-0" Min for payment Face of Backwall 3' -6" 7 1 / 4 " 3 Some as S l o b Jt Opening ( L Splice 1 2 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - D — — — — — — — — — — — — — — . 0 I I I I I I I I I I I I I I Limits of Abut Wingwall AT ABUTMENT BENTS Showing TL -3 Transition CL 5 - 7 /8" Dia A325 Bolts with two 1 %4" O.D. washers. Place washer under each head and nut. Bolts must be of sufficient length to extend /2" to %4" beyond nut. Terminal Connectors and associated hardware are to be paid for under the Item "Metal Beam Guard Fence ". 3 13& " 7 Top of Abut Wingwall CL Thrie -Beam Terminal Connector (10 Goge)(� Approach Slab or CRCP 1 12" Pref B i tum Fiber Material SECTION ELEVATION TL -3 TERMINAL CONNECTION DETAILS 1 /4" Min 1 /4" Min Some as Slab %4" Max it Opening Form to here. See "Intermediate Wall Joint Detail AT INTERMEDIATE WALL JOINTS AT BENTS WITHOUT EXPANSION JOINTS AT SLAB EXPANSION JOINTS ROADWAY ELEVATION OF RAIL Slab Const Jt or Controlled Jt 1 /4" Min %4" Max o Tool V groove I NTERMEDIATE WALL ,JOINT DETAI Note: Provide intermediate wall joints over all slab construction joints, over interior supports on continuous units, and at equal intervals in between as necessary to maintain a 33' maximum length of unbroken wall. C L 5 - 1" Dia holes and 2 1 /2" Dia x 2" deep recesses. Holes and recesses must be formed or cored. Percussion drilling is not permitted. Adjust placement of reinforcing steel as necessary to avoid bolt holes and recesses. Bolt recesses are only required when pedestrian sidewalks are adjacent to back of rail. End of Back of Rail Offset and reveals. 2 Eq Spa Bars Si - Spa at G" Max 3 Bars Si U and H - Spa at 6" Max 3" Same as Slab I I Joint Opening 12" R Bend R(tt6) as shown Si( #5) Si( #5) O I S2( #5)) J S3( #5) FT TISE Field bend reinforcing as necessary to maintain 2" cover at taper Typ) I1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 WU( #5) R( #6) H( #5) 6 R( #6) at 8" Max II � -U( #5) Top of 3 Abutment (TYp) Wingwall ELEVATION SHOWING TYPICAL REINFORCING PLACEMENT Metal Beam Guard Fence Transitions must be attached to the bridge rail and extended along the embankment unless otherwise shown in the plans. O Terminal Connector and associated hardware are to be paid for under the Item "Metal Beam Guard Fence ". I ) End back of rail offset and reveals. See "TL -3 Terminal Connection Details ". O Increase 2" for structures with Overlay. Back of rail offset and reveals may, with Engineer's approval, be continued to end of the railing. ® Bars H( #5) are part of rail reinforcing and are included in unit price bid for railing. Extend Bars H 2-0" Min past CL of beam /girder. Space with Bars U . Bars H match slab bar cover. Bars H may be bundled with top slab reinforcing if spacing is equivalent. Omit Bars H when top slab reinforcement is spaced less than 4 ". 3" /4" Min J4 " Max N C C Y ----- - - - - -- o a to — i Intermediate Wall Joint (See Detail) SHEET 1 OF 3 Texas Deportment of Transportation Ar Bridge Division TRAFFIC RAIL TYPE T80SS FIEF: rIstd016. K, - TX DOT cK: TxDOT Dw: JTR cgu. JMH © TxDOT April 2009 DISFRICF FEDERAL AID PR O,I ECI SHIIT REVISION I U +v v U > N omo� L O + d N N +D+ o a L • _ L 3 C O N 4J OL N N + w C O N .- a' O'L NC C 7• -•- W IaL+ N O C 7 C r N xaom N L ~ O O N w ._ v N N U L H L a —0 N E o >a TxCa a, O U L D T O 1.) d) C L N L 4J ++ oa - > oi U � wv N L N•- T - + + D • U ac -v L• -•- L OYf L 0 0 C N U C O C C C +oo•- N U a N L N O U O L w L - + 0 C c o O 0 L N N L N+ .. N O E O w 7 3 N E 7, O 00 a,zo —C J H L U O N V + CR- UX+ o ago 3" Bars Si Spa at 6" Max ( L Rail Joi the plans or as directed by the Engineer. Drains should not be placed over railroad tracks, lower roadways, or sidewalks. When this rail is used as a separator between a roadway surface and a sidewalk surface, side drain slots will not be permitted. S1( #5) Adjust bottom bars R( #6) as required to maintain 2" cover over slots. C C o 0 o a - a � o a 1 5 o 0 1 5 a CL CL CL a On 1 0 `n Ln 1 0 ` L Nominal L L Nominal L m Face of Roil �° m Face of Roil 1 + 1 + = ti 1" R or = 1" R or = Chamfer (Typ) M Chamfer (Typ) M Ln M Ln m m Si( #5) S1( #5) Reveals Reveals 4� U U O U U a s R( #6) a CL R( #6) a In I rl O a 2 4 2 1 /4 „ a O a 2 4 Q 2 1 � 4 „ a m O 1 I 12 a m 1 I /2 a 0 5 I /4 "� 5 I /4 Approach L o o c WU( #5) Slab + O :E. or CRCP -- - -- - - -- v a L 10 Vertical S I /2 " Pref B i tum = -0 �° v 7 9 P Fiber Material -0 U( #5) Reinforcing o a CO m H (45) (6 ON ABUTMENT WINGWALLS ® ON BRIDGE SLAB SECTIONS THRU RAIL® Field bend or cut bars S( #5) as required at slots. Reveals - See "Section Thru Rail" for Reveal Placement. R( #6) 1 I /2 2 I /4 " SECTION THRU OPTIONAL SIDE SLOT DRAIN 1 -5' Nominal Face of Roil -1" R or Chamfer (Typ) Reveals - See "Typical Reveal Detail ". REVEAL PLACEMENT (Showing location of Reveals) /2 N / TYPICAL REVEAL DETAIL Increase 2" for structures with Overlay. 5 /Z" when vertical reinforcing has closer clear cover over horizontal reinforcing in abutment wingwolIs on traffic side of wall. © Bars H( #5) are part of rail reinforcing and are included in unit price bid for railing. Extend Bars H 2' -0" Min past CU of beam /girder. Space with Bars U . Bars H match slab bar cover. Bars H may be bundled with top slab reinforcing if spacing is equivalent. Omit Bars H when top slab reinforcement is spaced less than 4 ". O Top longitudinal slab bar may be adjusted laterally 3" plus or minus to tie reinforcing. ® Mounting this rail to retaining walls requires additional details not covered by this standard. SHEET 2 OF 3 Texas Deportment of Transportation A Bridge Division TRAFFIC RAIL TYPE T80SS FIEF: r I std016. dgn DNz FOOL cH: FOOL DW: JTR cgu. dMH ©TxDOT April 2009 DISFRICF FEDERAL AID PROJECT SHEET REVISIONS COUNFY CONTROL SEC1 I JOD JHIGHWAL OT panel IengTn WI Tn ]I OFF ]I OFF side slot drains OPTIONAL SIDE SLOT DRAIN DETAIL