Loading...
ST0301A-CN100910 Page 1 of 1 Keith Marvin - Bethel Road Reconstruction - Response to RFI 013 From:   Caleb Thornhill <bct@freese.com> To:   Keith Marvin <kmarvin@coppelltx.gov> Date:   9/10/2010 9:25 AM Subject:   Bethel Road Reconstruction - Response to RFI 013 CC:CPL03243 <CPL03243@freese.com>, Peter Kau <vbk@freese.com>, Chris Poteet     <cjp@freese.com> Attachments:   Response to RFI 013 .docx   Keith,   Attached is the response to RFI 013.  Please contact me with any questions.   B. Caleb Thornhill P.E. Project Manager Freese and Nichols, Inc. Main: 214-217-2200  Direct: 214-217-2282  Fax: 214-920-2565  Email: bct@freese.com    Please consider the environment before printing this message. This electronic mail message is intended exclusively for the individual or entity to which it is addressed. This message, together with any attachment, may contain the sender's organization's confidential and privileged information. The recipient is hereby notified to treat the information as confidential and privileged and to not disclose or use the information except as authorized by sender's organization. Any unauthorized review, printing, retention, copying, disclosure, distribution, retransmission, dissemination or other use of, or taking of any action in reliance upon, this information by persons or entities other than the intended recipient is prohibited. If you received this message in error, please immediately contact the sender by reply email and delete all copies of the material from any computer. Thank you for your cooperation. file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4C89F96FCity_...1/25/2011 [F&N Project No.] PROJECT NUMBER REQUEST FOR INFORMATION (4.14 / ) PROJECT: PROJECT NUMBER: Bethel Road Reconstruction – Phase I OWNER: City of Coppell CPL03423 CONTRACTOR: JRJ Paving, LP ENGINEER: Freese & Nichols, Inc. REFERENCE DATA: Specification Section No._________Page No._____ Paragraph No._____ Drawing No._____ Detail description: RFI 013  CONTRACTOR REQUESTS: Information Interpretation Clarification for the items described below or in the attached material referenced below: Keith, In my discussion with Johnny Heine, Mels Electric, he would like to request the following information: 1 – Need address for the new service location being serviced from the west side of the bridge on Bethel Rd, from the telephone pole in front of Phil’s house. Oncor is requesting 2” conduit be ran for this service. 2 – Need to know if instead of installing the 3” conduit which plans call to be attached to the side of the bridge, changed to being installed inside the bridge slab so it can service the lights on the bridge. If you have any questions pertaining to this, please feel free to contact me. Thank you, Dean CONTRACTOR'S PROPOSED SOLUTION: REQUESTED BY: Dean Dumke DATE: September 1, 2010  ENGINEER'S RESPONSE: Information Interpretation Clarification for the items described above or in the attached material referenced: Address provided by City. Bridge conduit can run through the bridge slab, sidewalk or bridge rail as needed. It’s recommended decreasing conduit size to 2” PVC Conduit. RESPONSE BY: B. Caleb Thornhill, P.E. DATE: September 10, 2010 C:\DOCUME~1\radloo\LOCALS~1\Temp\XPgrpwise\Response to RFI 013 .docx