Loading...
Sales Tax 09-CS110124 T H E • C 1 T Y O F COPPELL , r e q A 5 8 January 24, 2011 Ryan Dowdy RKM Utility Services, Inc. 1544 Valwood Parkway, Suite 100 Carrollton, TX 75006 RE: Sales Tax 2009 Street Reconstruction — Heartz Rd. Dear Mr. Dowdy: Representatives of the City of Coppell have confirmed a final inspection of paving and utilities for Heartz Road. As of January 21, 2011 contract time has stopped for this portion of the project. A letter of Final Acceptance will be issued for Heartz Road and for Clear Creek when work is fully complete on Clear Creek Lane. A follow -up inspection of the facilities will be conducted prior to the lapse of the two -year bond period which will begin on the date of the Final Acceptance. If any punchlist items are noted at that time, you will be contacted to make repairs. Thank you for your cooperation during the course of these projects. Sincerel , Rick O'Dell Construction Inspector Keith R. Marvin, P.E. Office Phone: (972) 304 -7090 Project Engineer Fax: (972) 304 -3570 cc: Ken Griffin, P.E., Director of Engineering & Public Works Glenn Hollowell, P.E., Asst. Director of Public Works Jennifer Miller, Finance Director Tim Oates, Deputy Chief/Prevention Rick Walker, Main Street America MGA A FAMILY COMMUNITY FOR A LIFETIME 255 PARKWAY * P.O. BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * WWW.COPPELLTX.GOV