ST0301A-CS100913 (1/27/2011) Keith Marvin - RE: Bethel Road Reconstruction - Approved Submittal for Cement Treated Base BackfillPage 1 From: Caleb Thornhill <bct@freese.com> To: Keith Marvin <kmarvin@coppelltx.gov> Date: 9/13/2010 1:42 PM Subject: RE: Bethel Road Reconstruction - ApprovedSubmittalforCement Treated Base Backfill Should have an answer on the rip rap later today. I'll look at the drainage while I'm out there. Will you be in the field, or do you want me to swing by the office? B. Caleb Thornhill, P.E. Freese & Nichols, Inc. 214-217-2282 -----Original Message----- From: Keith Marvin [mailto:kmarvin@coppelltx.gov] Sent: Monday, September 13, 2010 1:41 PM To: Caleb Thornhill Subject: RE: Bethel Road Reconstruction - Approved Submittal for Cement Treated Base Backfill bridge rip-rap and drainage east of the bridge. Keith Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> Caleb Thornhill <bct@freese.com> 9/13/2010 1:37 PM >>> Will do Keith. Anything else we need to talk about while I'm out there? B. Caleb Thornhill, P.E. Freese & Nichols, Inc. 214-217-2282 -----Original Message----- From: Keith Marvin [mailto:kmarvin@coppelltx.gov] Sent: Monday, September 13, 2010 1:29 PM To: Caleb Thornhill; Dean Dumke; steve@ntbridge.com Cc: Chris Poteet; CPL03243; Peter Kau Subject: Re: Bethel Road Reconstruction - Approved Submittal for Cement Treated Base Backfill Caleb, Please schedule the engineer for a site visit at 2:30 tomorrow to inspect steel in the retaining wall and the bridge slab. Keith Marvin, P.E. Project Engineer (1/27/2011) Keith Marvin - RE: Bethel Road Reconstruction - Approved Submittal for Cement Treated Base BackfillPage 2 (972) 304-3681 >>> <steve@ntbridge.com> 9/13/2010 6:45 AM >>> The steel tying begins this morning--there will be enough in place for inspection around 2:00 PM today Steve Goodman NTBC -----Original Message----- From: Keith Marvin [mailto:kmarvin@coppelltx.gov] Sent: Friday, September 10, 2010 11:35 AM To: 'Caleb Thornhill', 'Dean Dumke', steve@ntbridge.com Cc: 'Chris Poteet', 'CPL03243', 'Peter Kau' Subject: Re: Bethel Road Reconstruction - Approved Submittal for Cement Treated Base Backfill Caleb, Please have a representative of the structural engineer on site Monday morning to inspect the bridge deck steel placement as well as the retaining wall steel. Thanks, Keith Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> 9/9/2010 5:44 PM >>> Caleb When will you know if a screen wall is added? We should be ready for a rebar inspection on Monday afternoon and place concrete on Tuesday, so we need to know about the added screen wall by Monday at Noon Thanks Steve Goodman -----Original Message----- From: Caleb Thornhill [mailto:bct@freese.com] Sent: Thursday, September 9, 2010 05:35 PM To: steve@ntbridge.com, 'Keith Marvin', 'Dean Dumke' Cc: 'CPL03243', 'Peter Kau', 'Chris Poteet' Subject: RE: Bethel Road Reconstruction - Approved Submittal for Cement Treated Base Backfill v\:* {behavior:url(#default#VML);}o\:* {behavior:url(#default#VML);}w\:* {behavior:url(#default#VML);}.shape {behavior:url(#default#VML);}Steve, ?The vert bar shown at 5? C-C is in case the screening wall is being added. If we only put a traffic rail on the wall, these can be removed. ?Structures is verifying the need for select backfill. I will have a response to you in the morning. ?Natural ground is acceptable for the 1ft space beyond the concrete placement ?0?, flush, is acceptable B. Caleb Thornhill, P.E. Freese & Nichols, Inc. 214-217-2282 From: steve@ntbridge.com [mailto:steve@ntbridge.com] Sent: Thursday, September 09, 2010 9:25 AM To: Caleb Thornhill Subject: Re: Bethel Road Reconstruction - Approved Submittal for Cement Treated Base Backfill I had questions on your wall modification detail that have not been answered: There is a vert bar shown at 5" ctrs that should be 15"? See the upper Left Detail There is select backfill shown with no pay item? There is a 1 Ft space beyond the concrete placement that shows select fill? I would propose the concrete to be placed against natural ground maybe (12" min) maybe 15-16" from the exist footing. RW2 shows a keyway with a 2x4 placed at the top of the wall footing? It says 0-2" in Ht. We will place the 2x4 at 0", flush with the top of the footing. RW2 We have the reinforcing on site and will begin the modifications Monday September 13 Please clarify so we have no questions on the site Thanks Steve Goodman NTBC -----Original Message----- From: Caleb Thornhill [mailto:bct@freese.com] Sent: Wednesday, September 8, 2010 05:50 PM To: 'Keith Marvin', 'Dean Dumke' Cc: steve@ntbridge.com, 'CPL03243', 'Chris Poteet', 'Tony Diaz' Subject: Bethel Road Reconstruction - Approved Submittal for Cement Treated Base Backfill Keith/Dean, Cement Treated Base Backfill has been approved. See attached for your reference. B. Caleb Thornhill P.E. Project Manager Freese and Nichols, Inc. ( Main: 214-217-2200 ( Direct: 214-217-2282 ( Fax: 214-920-2565 * Email: bct@freese.com Please consider the environment before printing this message. ------------------------------------------------------------ This electronic mail message is intended exclusively for the individual or entity to which it is addressed. This message, together with any attachment, may contain the sender's organization's confidential and privileged information. The recipient is hereby notified to treat the information as confidential and privileged and to not disclose or use the information except as authorized by sender's organization. Any unauthorized review, printing, retention, copying, disclosure, distribution, retransmission, dissemination or other use of, or taking of any action in reliance upon, this information by persons or entities other than the intended recipient is prohibited. If you received this message in error, please immediately contact the sender by reply email and delete all copies of the material from any computer. Thank you for your cooperation.