Keith Marvin - RE: Bethel Rd - S Wall Footing
From: Caleb Thornhill <bct@freese.com>
To:"steve@ntbridge.com" <steve@ntbridge.com>, Dean Dumke <deand@JRJPaving.com>,
"kmarvin@coppelltx.gov" <kmarvin@coppelltx.gov>
Date: 9/29/2010 3:48 PM
Subject: RE: Bethel Rd - S Wall Footing
CC:Marty Murphy <Martym@JRJPaving.com>, Tony Diaz <AD@freese.com>, CPL03243
<CPL03243@freese.com>
Steve,
Regarding the weep holes, due to the changing field conditions during construction and the retrofitting of the
footing, it is difficult for us to pinpoint the finished grade on the face of wall. The finished grade shall cover the
footing with a minimum 1’ cover and weep holes a minimum of 3” above the finished grade. It is our intent to
match the existing grades prior to construction of the footing/wall.
B. Caleb Thornhill, P.E.
Freese & Nichols, Inc.
214-217-2282
From: steve@ntbridge.com [mailto:steve@ntbridge.com]
Sent: Wednesday, September 29, 2010 12:03 PM
To: Caleb Thornhill; Dean Dumke; kmarvin@coppelltx.gov
Cc: steve@ntbridge.com; Marty Murphy; Tony Diaz; CPL03243
Subject: Re: Bethel Rd - S Wall Footing
The footing width will be the same as a 6 ft high wall because the steel is on site
The footing will be stepped up at what was placed yesterday 1 Ft and then another 1 Ft step up at the next section to the
bridge
There will be very little face of the wall showing with the existing and finish grade at 1'-6" below the top of the wall near the
power pole
That brings up the weep hole elevation question again--Can you give us a finish grade on the ROW side of the wall and we
will place the weepholes at 6" plus---THIS placement will be tomorrow !
What about my RFI about the Coppell Rail Ht on the bridge? It should be 3' 6"--CORRECT??
Steve Goodman
NTBC
-----Original Message-----
From: Caleb Thornhill [mailto:bct@freese.com]
Sent: Wednesday, September 29, 2010 12:50 PM
To: 'Dean Dumke', kmarvin@coppelltx.gov
Cc: steve@ntbridge.com, 'Marty Murphy', 'Tony Diaz', 'CPL03243'
Subject: RE: Bethel Rd - S Wall Footing
Dean,
We don?t see any issues with adjusting the wall footing to minimize excavation near conflicts. Please ensure
that steel and footing sizes for the wall match revised wall height.
file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4CA35FBDCity...1/28/2011
Page 2 of 2
B. Caleb Thornhill, P.E.
Freese & Nichols, Inc.
214-217-2282
From: Dean Dumke [mailto:deand@JRJPaving.com]
Sent: Tuesday, September 28, 2010 6:40 PM
To: kmarvin@coppelltx.gov; Caleb Thornhill
Cc: steve@ntbridge.com; Marty Murphy
Subject: Bethel Rd - S Wall Footing
Keith & Caleb,
Per my discussion with Caleb this evening after speaking about site striping, attached is the RFI 017 regarding
raising s wall footing to minimize excavation near telephone pole and guy wire.
Thank you,
Dean Dumke
Sr Project Manager
#469-223-7879
JRJ PAVING, L. P.
_______________________
Please consider the environment before printing this message.
This electronic mail message is intended exclusively for the individual or entity to which it is addressed. This message, together with any attachment,
may contain the sender's organization's confidential and privileged information. The recipient is hereby notified to treat the information as confidential
and privileged and to not disclose or use the information except as authorized by sender's organization. Any unauthorized review, printing, retention,
copying, disclosure, distribution, retransmission, dissemination or other use of, or taking of any action in reliance upon, this information by persons or
entities other than the intended recipient is prohibited. If you received this message in error, please immediately contact the sender by reply email and
delete all copies of the material from any computer. Thank you for your cooperation.
file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4CA35FBDCity...1/28/2011
Page 1 of 2
Keith Marvin - Re: Bethel Rd - S Wall Footing
From:
<steve@ntbridge.com>
To:"Caleb Thornhill" <bct@freese.com>, "Dean Dumke" <deand@JRJPaving.com>,
<kmarvin@coppelltx.gov>
Date: 9/29/2010 12:05 PM
Subject:
Re: Bethel Rd - S Wall Footing
CC:<steve@ntbridge.com>, "Marty Murphy" <Martym@JRJPaving.com>, "Tony Diaz"
<AD@freese.com>, "CPL03243" <CPL03243@freese.com>
The footing width will be the same as a 6 ft high wall because the steel is on site
The footing will be stepped up at what was placed yesterday 1 Ft and then another 1 Ft step up at the next section to the bridge
There will be very little face of the wall showing with the existing and finish grade at 1'-6" below the top of the wall near the
power pole
That brings up the weep hole elevation question again--Can you give us a finish grade on the ROW side of the wall and we will
place the weepholes at 6" plus---THIS placement will be tomorrow !
What about my RFI about the Coppell Rail Ht on the bridge? It should be 3' 6"--CORRECT??
Steve Goodman
NTBC
-----Original Message-----
From: Caleb Thornhill [mailto:bct@freese.com]
Sent: Wednesday, September 29, 2010 12:50 PM
To: 'Dean Dumke', kmarvin@coppelltx.gov
Cc: steve@ntbridge.com, 'Marty Murphy', 'Tony Diaz', 'CPL03243'
Subject: RE: Bethel Rd - S Wall Footing
Dean,
We don?t see any issues with adjusting the wall footing to minimize excavation near conflicts. Please ensure that
steel and footing sizes for the wall match revised wall height.
B. Caleb Thornhill, P.E.
Freese & Nichols, Inc.
214-217-2282
From: Dean Dumke [mailto:deand@JRJPaving.com]
Sent: Tuesday, September 28, 2010 6:40 PM
To: kmarvin@coppelltx.gov; Caleb Thornhill
Cc: steve@ntbridge.com; Marty Murphy
Subject: Bethel Rd - S Wall Footing
Keith & Caleb,
Per my discussion with Caleb this evening after speaking about site striping, attached is the RFI 017 regarding
raising s wall footing to minimize excavation near telephone pole and guy wire.
Thank you,
Dean Dumke
file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4CA32B95City_...1/28/2011
Page 2 of 2
Sr Project Manager
#469-223-7879
JRJ PAVING, L. P.
_______________________
Please consider the environment before printing this message.
This electronic mail message is intended exclusively for the individual or entity to which it is addressed. This message, together with any attachment,
may contain the sender's organization's confidential and privileged information. The recipient is hereby notified to treat the information as confidential
and privileged and to not disclose or use the information except as authorized by sender's organization. Any unauthorized review, printing, retention,
copying, disclosure, distribution, retransmission, dissemination or other use of, or taking of any action in reliance upon, this information by persons or
entities other than the intended recipient is prohibited. If you received this message in error, please immediately contact the sender by reply email and
delete all copies of the material from any computer. Thank you for your cooperation.
file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4CA32B95City_...1/28/2011
JRJ PAVING, L. P.
_______________________
1805 Royal Lane, Suite 107
Dallas, Texas 75229
214-466-8340 Phone
214-466-8354 Fax
REQUEST FOR INFORMATION
Project:Bethel Road
RFI No:17
Date:September 28, 2010
Subject:South Retaining Wall
Reference Drawing:GR-1
INFORMATION REQUESTED:
1.The last 60 linear feet of the south retaining wall encroaches upon a telephone guy wire, a
telephone pole, and a water line manhole. In conversations JRJ and North Texas Bridge have
had with Oncor representatives, it has been determined by Oncor that the depth required
for the retaining wall could potentially cause a hazard if excavated the full depth. We are
requesting raising the footing to match the repair height footing, 1 foot, to minimize the
excavation near the guy wire and telephone pole. The footing still will be covered with 2 to
3 foot of dirt after raising. We would like your permission to make this change.
Requested by:
Dean Dumke
Sr Project Manager
deand@jrjpaving.com
Mobile: 469-223-7879
Page 1 of 1
Keith Marvin - RE: Bethel Rd - S Wall Footing
From: Caleb Thornhill <bct@freese.com>
To:Dean Dumke <deand@JRJPaving.com>, "kmarvin@coppelltx.gov"
<kmarvin@coppelltx.gov>
Date: 9/29/2010 11:52 AM
Subject: RE: Bethel Rd - S Wall Footing
CC:"steve@ntbridge.com" <steve@ntbridge.com>, Marty Murphy <Martym@JRJPaving.com>,
Tony Diaz <AD@freese.com>, CPL03243 <CPL03243@freese.com>
Dean,
We don’t see any issues with adjusting the wall footing to minimize excavation near conflicts. Please ensure
that steel and footing sizes for the wall match revised wall height.
B. Caleb Thornhill, P.E.
Freese & Nichols, Inc.
214-217-2282
From: Dean Dumke [mailto:deand@JRJPaving.com]
Sent: Tuesday, September 28, 2010 6:40 PM
To: kmarvin@coppelltx.gov; Caleb Thornhill
Cc: steve@ntbridge.com; Marty Murphy
Subject: Bethel Rd - S Wall Footing
Keith & Caleb,
Per my discussion with Caleb this evening after speaking about site striping, attached is the RFI 017 regarding
raising s wall footing to minimize excavation near telephone pole and guy wire.
Thank you,
Dean Dumke
Sr Project Manager
#469-223-7879
JRJ PAVING, L. P.
_______________________
Please consider the environment before printing this message.
This electronic mail message is intended exclusively for the individual or entity to which it is addressed. This message, together with any attachment,
may contain the sender's organization's confidential and privileged information. The recipient is hereby notified to treat the information as confidential
and privileged and to not disclose or use the information except as authorized by sender's organization. Any unauthorized review, printing, retention,
copying, disclosure, distribution, retransmission, dissemination or other use of, or taking of any action in reliance upon, this information by persons or
entities other than the intended recipient is prohibited. If you received this message in error, please immediately contact the sender by reply email and
delete all copies of the material from any computer. Thank you for your cooperation.
file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4CA32883City_...1/28/2011