Loading...
ST0301A-CS101013 (1/28/2011) Keith Marvin - FW: Change order number 3 - Bethel Road Part 2Page 1 From: "Dean Dumke" <deand@JRJPaving.com> To: "Keith Marvin" <kmarvin@coppelltx.gov> Date: 10/13/2010 3:57 PM Subject: FW: Change order number 3 - Bethel Road Part 2 Keith, I forgot about the $507.06 check we wrote for ONCOR to hold up the pole. That was the 2nd check JRJ wrote. I was reviewing my change order summary and realized I left this one off. Dean -----Original Message----- From: Dean Dumke Sent: Wednesday, October 13, 2010 3:25 PM To: 'Keith Marvin' Subject: RE: Change order number 3 - Bethel Road Keith, I have reviewed what you sent and at this time everything is accounted for except one item listed on the drain at the spring change order: 4"PVC Pipe outfall through curb w/ 2- 2" Pipe15 lf at $2.40/lf = $36.00. The French drain was omitted, but the other was necessary and Larry wanted it installed. If you can get this back to me, I can get signed for full execution of the change order. Thanks, Dean Dumke Sr Project Manager JRJ Paving -----Original Message----- From: Keith Marvin [mailto:kmarvin@coppelltx.gov] Sent: Wednesday, October 13, 2010 8:43 AM To: Dean Dumke Cc: Kim Entrekin; Marty Murphy Subject: Change order number 3 - Bethel Road Dean, Please review what I have on change order number 3. These are all the outstanding items I am aware of. Please let me know if I've forgotten anything. Keith Keith Marvin, P.E. Project Engineer (972) 304-3681 (1/28/2011) Keith Marvin - RE: Change order number 3 - Bethel RoadPage 1 From: "Dean Dumke" <deand@JRJPaving.com> To: "Keith Marvin" <kmarvin@coppelltx.gov> Date: 10/13/2010 3:23 PM Subject: RE: Change order number 3 - Bethel Road Keith, I have reviewed what you sent and at this time everything is accounted for except one item listed on the drain at the spring change order: 4"PVC Pipe outfall through curb w/ 2- 2" Pipe15 lf at $2.40/lf = $36.00. The French drain was omitted, but the other was necessary and Larry wanted it installed. If you can get this back to me, I can get signed for full execution of the change order. Thanks, Dean Dumke Sr Project Manager JRJ Paving -----Original Message----- From: Keith Marvin [mailto:kmarvin@coppelltx.gov] Sent: Wednesday, October 13, 2010 8:43 AM To: Dean Dumke Cc: Kim Entrekin; Marty Murphy Subject: Change order number 3 - Bethel Road Dean, Please review what I have on change order number 3. These are all the outstanding items I am aware of. Please let me know if I've forgotten anything. Keith Keith Marvin, P.E. Project Engineer (972) 304-3681