ST0301A-CN101013 Page 1 of 1 Keith Marvin - Re:  Fwd:  Bethel Road - South Retaining Wall Resubmittal From:   <steve@ntbridge.com> To:"Keith Marvin" <kmarvin@coppelltx.gov>, <deand@JRJPaving.com>,     <Kime@JRJPaving.com>, <steve@ntbridge.com> Date:   10/15/2010 12:27 PM Subject:   Re:  Fwd:  Bethel Road - South Retaining Wall Resubmittal CC:   "Larry Davis" <LDAVIS@coppelltx.gov>, "Caleb Thornhill"    <bct@freese.com>   Yes we are using the same detail on the entire 150 Ft section   See the attached wall heights for the record and SF for payment   Steve Goodman NTBC -----Original Message----- From: Keith Marvin [mailto:kmarvin@coppelltx.gov] Sent: Thursday, October 14, 2010 04:48 PM To: deand@JRJPaving.com, Kime@JRJPaving.com, steve@ntbridge.com Cc: 'Larry Davis', 'Caleb Thornhill' Subject: RE: Fwd: Bethel Road - South Retaining Wall Resubmittal Dean, The retaining wall repair is approved for use on the area of wall that was improperly constructed. There is a label on the provided drawing that seems to imply that the repair is only for use on wall sections between 7 and 8 feet tall. Our expectation is that this detail will be used to reinforce the wall for the entire length of improperly constructed wall. If this is not your intention, please advise us so we can discuss it further. Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> Caleb Thornhill 10/14/2010 2:34 PM >>> Keith, The steel spacing is acceptable. As long as they are aware this detail will be applied the entire length of constructed wall, we will approve this detail. B. Caleb Thornhill, P.E. Freese & Nichols, Inc. 214-217-2282 -----Original Message----- From: Keith Marvin [mailto:kmarvin@coppelltx.gov] Sent: Thursday, October 14, 2010 10:26 AM To: Tony Diaz; Caleb Thornhill Cc: Tricia Hatley Subject: FW: Fwd: Bethel Road - South Retaining Wall Resubmittal Caleb, See attached. They still have the 7'-8' label, but does the steel spacing look better? Keith Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> "Kim Entrekin" 10/14/2010 10:23 AM >>> Hard copies to follow. From: Dean Dumke Sent: Wednesday, October 13, 2010 5:42 PM To: Kim Entrekin Subject: FW: Fwd: Bethel Road - South Retaining Wall Resubmittal Kim, Please resubmit the attached revision o the revision for approval of south retaining wall fix to Keith Marvin, Coppell, and Caleb Thornhill, F&N, first thing in the morning so hopefully we can get final approval to proceed. Thank you, Dean Please consider the environment before printing this message. This electronic mail message is intended exclusively for the individual or entity to which it is addressed. This message, together with any attachment, may contain the sender's organization's confidential and privileged information. The recipient is hereby notified to treat the information as confidential and privileged and to not disclose or use the information except as authorized by sender's organization. Any unauthorized review, printing, retention, copying, disclosure, distribution, retransmission, dissemination or other use of, or taking of any action in reliance upon, this information by persons or entities other than the intended recipient is prohibited. If you received this message in error, please immediately contact the sender by reply email and delete all copies of the material from any computer. Thank you for your cooperation. file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4CB848BECity_...1/28/2011 Bethel RoadWall Heights City of CoppellOct 15, 2010 Quantity for payment measured by NTBC October 14, 2010 North Wall LocationBegin HeightEnd HeightAvg HeightLengthArea SF Begin East4.585.685.1360.00307.80 5.686.756.2260.00372.90 6.756.586.6760.00399.90 6.585.426.0090.00540.00 1620.60 North Wall LocationBegin HeightEnd HeightAvg HeightLengthArea SF Begin West7.586.587.08150.001062.00 5.835.505.6790.00509.85 4.504.504.5030.00135.00 3.503.503.5030.00105.00 2.832.832.8324.0067.92 1879.77 Final Pay Quantity =3500.37 Submitted By: ______________________________ Stephen P Goodman, NTBCDate Page 1 of 1 Keith Marvin - Bethel Rd - RFI 18 & 19, Change Order 16, 12R, & 9BR From:   "Dean Dumke" <deand@JRJPaving.com> To:   "Keith Marvin" <kmarvin@coppelltx.gov> Date:   10/13/2010 5:27 PM Subject:   Bethel Rd - RFI 18 & 19, Change Order 16, 12R, & 9BR CC:   "Butch Cross" <butchc@JRJPaving.com>, "Kim Entrekin" <Kime@JRJPaving.com> Attachments:RFI 019 Solid Coppell Rail.xlsx; RFI 018 Coppell Rail Cap.xlsx; CO16 Rail Reduction on Bridge.pdf; CO9BR Oncor Invoice for Holding Pole.pdf; CO12R The Springs     Drainage.pdf   Keith,   Attached are following:   Writable RFI 18 - Coppell Rail Cap Writable RFI 19 - Solid Coppell Rail Change order 16 - Rail reduction Change order 12R - deleting out french drain previously sent Change order 9BR - Oncor Invoice for holding pole   If you have any questions regarding these, please feel free to contact me.   Thank you,   Dean file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4CB5EC15City_...1/28/2011 JRJ PAVING, L. P. _______________________ 1805 Royal Lane, Suite 107 Dallas, Texas 75229 214-466-8340 Phone 214-466-8354 Fax REQUEST FOR INFORMATION Project:Bethel Road RFI No:18 Date:October 13, 2010 Subject:Coppell Rail Steel Reference Drawing:ST-12 & TXDOT Combination Railing Type C411 INFORMATION REQUESTED: 1.There seems to be an over build in the top bar railing of the Coppell Rail Detail which will not allow even a pencil vibrator to be used on the railing. North Texas Bridge has met with Coppell Personnel on site and made several suggestions, please have structural engineer review existing detail along with TXDOT C411 detail and give fix to problem. Requested by: Dean Dumke Sr Project Manager deand@jrjpaving.com Mobile: 469-223-7879 JRJ PAVING, L. P. _______________________ 1805 Royal Lane, Suite 107 Dallas, Texas 75229 214-466-8340 Phone 214-466-8354 Fax REQUEST FOR INFORMATION Project:Bethel Road RFI No:19 Date:October 13, 2010 Subject:Omit Coppell Rail and Install Solid Rail Reference Drawing:Luis Pajaras Property INFORMATION REQUESTED: 1.I would like to request what is the actual length of the solid wall at Luis Parajas Property. It has changed from 60' to 30' and now are informed back to 60'. Can you please respond and let me know what distance we need to install the solid wall instead of Plan Coppell Rail. Requested by: Dean Dumke Sr Project Manager deand@jrjpaving.com Mobile: 469-223-7879