Keith Marvin - Bethel Road Reconstruction - Site Visit 10-25-10
From: Caleb Thornhill <bct@freese.com>
To: Keith Marvin <kmarvin@coppelltx.gov>
Date: 10/26/2010 3:54 PM
Subject: Bethel Road Reconstruction - Site Visit 10-25-10
CC:CPL03243 <CPL03243@freese.com>, Peter Kau <vbk@freese.com>, Joel Darr
<jpd@freese.com>, Tony Diaz <AD@freese.com>
Attachments: Site Visit Report 10-25-10.docx
Keith,
I’ve attached a site visit report from our visit yesterday. There appears to be one discrepancy in the steel
placement and layout. We’ve highlighted this discrepancy on the last page of the site visit report. These bars
will need to be untied and retied to match ReedCon’s detail.
If you have any questions or need additional information, let me know.
B. Caleb Thornhill P.E.
Project Manager
Freese and Nichols, Inc.
Main: 214-217-2200
Direct: 214-217-2282
Fax: 214-920-2565
Email: bct@freese.com
Please consider the environment before printing this message.
This electronic mail message is intended exclusively for the individual or entity to which it is addressed. This message, together with any attachment,
may contain the sender's organization's confidential and privileged information. The recipient is hereby notified to treat the information as confidential
and privileged and to not disclose or use the information except as authorized by sender's organization. Any unauthorized review, printing, retention,
copying, disclosure, distribution, retransmission, dissemination or other use of, or taking of any action in reliance upon, this information by persons or
entities other than the intended recipient is prohibited. If you received this message in error, please immediately contact the sender by reply email and
delete all copies of the material from any computer. Thank you for your cooperation.
file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4CC6F9BACity...1/28/2011
SITE VISIT
MEMORANDUM
OWNER: City of Coppell PROJECT NO.: CPL03243
PROJECT DESCRIPTION: Bethel Rd Bridge DATE: 10/25/2010
CONTRACTOR: North Texas Bridge Co., Inc. ARRIVAL TIME: 11:00 am
RESIDENT REPRESENTATIVE: N/A DEPARTURE TIME: 12:00 pm
PERSON VISITING THIS SITE: Joel Darr
CONSTRUCTION ACTIVITIES OBSERVED:
Placement of rebar in retaining wall repair
PHOTOGRAPHS TAKEN: YES NO ATTACHED FILED
DISCUSSION WITH CONTRACTOR OR RESIDENT REPRESENTATIVE:
The crew chief (Gilbert) led me to the area under consideration (south side of Bethel Rd.) where rebar
placement had started. Several modifications to the original reinforcement design were observed; all
changes were conservative except for one. The one unconservative change was to the wall’s flexural
steel which is a crucial element. See last page for field measurements.
FOLLOW UP ACTION REQUIRED:
FNI to revisit for progress in the month of November.
REPORT SUBMITTED BY: Joel Darr DATE: 10-25-10
ROUTING: THH PM RES. REP.
Fig.1 Reinforcement on South Side of Retaining Wall
Fig.2 Reinforcement on South Side of Retaining Wall
Fig.3 Weep Hole
Fig.4 Reinforcement on South Side of Retaining Wall
Fig.5 Reinforcement on South Side of Retaining Wall
Fig.6 Reinforcement on South Side of Retaining Wall
Fig.7 Reinforcement on South Side of Retaining Wall
Fig.8 Reinforcement on North Side of Retaining Wall
Fig.9 Reinforcement on North Side of Retaining Wall
Fig.10 Reinforcement on North Side of Retaining Wall
Fig.11 Reinforcement on North Side of Retaining Wall
Fig.12 Reinforcement on North Side of Retaining Wall
Fig.13 Reinforcement on North Side of Retaining Wall
Fig.14 Reinforcement on North Side of Retaining Wall, and Drilled Holes Showing
Spacing
Fig.15 Drilled Holes Showing Spacing on North Side of Retaining Wall