Loading...
ST0301A-CR101025 Page 1 of 1 Keith Marvin - Bethel Road Reconstruction - Site Visit 10-25-10 From:   Caleb Thornhill <bct@freese.com> To:   Keith Marvin <kmarvin@coppelltx.gov> Date:   10/26/2010 3:54 PM Subject:   Bethel Road Reconstruction - Site Visit 10-25-10 CC:CPL03243 <CPL03243@freese.com>, Peter Kau <vbk@freese.com>, Joel Darr     <jpd@freese.com>, Tony Diaz <AD@freese.com> Attachments:   Site Visit Report 10-25-10.docx   Keith,   I’ve attached a site visit report from our visit yesterday.  There appears to be one discrepancy in the steel placement and layout.  We’ve highlighted this discrepancy on the last page of the site visit report.  These bars will need to be untied and retied to match ReedCon’s detail.   If you have any questions or need additional information, let me know.   B. Caleb Thornhill P.E. Project Manager Freese and Nichols, Inc. Main: 214-217-2200  Direct: 214-217-2282  Fax: 214-920-2565  Email: bct@freese.com    Please consider the environment before printing this message. This electronic mail message is intended exclusively for the individual or entity to which it is addressed. This message, together with any attachment, may contain the sender's organization's confidential and privileged information. The recipient is hereby notified to treat the information as confidential and privileged and to not disclose or use the information except as authorized by sender's organization. Any unauthorized review, printing, retention, copying, disclosure, distribution, retransmission, dissemination or other use of, or taking of any action in reliance upon, this information by persons or entities other than the intended recipient is prohibited. If you received this message in error, please immediately contact the sender by reply email and delete all copies of the material from any computer. Thank you for your cooperation. file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4CC6F9BACity...1/28/2011 SITE VISIT MEMORANDUM OWNER: City of Coppell PROJECT NO.: CPL03243 PROJECT DESCRIPTION: Bethel Rd Bridge DATE: 10/25/2010 CONTRACTOR: North Texas Bridge Co., Inc. ARRIVAL TIME: 11:00 am RESIDENT REPRESENTATIVE: N/A DEPARTURE TIME: 12:00 pm PERSON VISITING THIS SITE: Joel Darr CONSTRUCTION ACTIVITIES OBSERVED: Placement of rebar in retaining wall repair PHOTOGRAPHS TAKEN: YES NO ATTACHED FILED DISCUSSION WITH CONTRACTOR OR RESIDENT REPRESENTATIVE: The crew chief (Gilbert) led me to the area under consideration (south side of Bethel Rd.) where rebar placement had started. Several modifications to the original reinforcement design were observed; all changes were conservative except for one. The one unconservative change was to the wall’s flexural steel which is a crucial element. See last page for field measurements. FOLLOW UP ACTION REQUIRED: FNI to revisit for progress in the month of November. REPORT SUBMITTED BY: Joel Darr DATE: 10-25-10 ROUTING: THH PM RES. REP. Fig.1 Reinforcement on South Side of Retaining Wall Fig.2 Reinforcement on South Side of Retaining Wall Fig.3 Weep Hole Fig.4 Reinforcement on South Side of Retaining Wall Fig.5 Reinforcement on South Side of Retaining Wall Fig.6 Reinforcement on South Side of Retaining Wall Fig.7 Reinforcement on South Side of Retaining Wall Fig.8 Reinforcement on North Side of Retaining Wall Fig.9 Reinforcement on North Side of Retaining Wall Fig.10 Reinforcement on North Side of Retaining Wall Fig.11 Reinforcement on North Side of Retaining Wall Fig.12 Reinforcement on North Side of Retaining Wall Fig.13 Reinforcement on North Side of Retaining Wall Fig.14 Reinforcement on North Side of Retaining Wall, and Drilled Holes Showing Spacing Fig.15 Drilled Holes Showing Spacing on North Side of Retaining Wall