Loading...
ST0301A-CS1010272011) Keith Marvin Bethel Rd - S Retain Wall Repair Ltr for 0 -150', w toe Page 1 From: "Dean Dumke" <deand @JRJ Paving .com> To: "Keith Marvin" <kmarvin @coppelltx.gov> Date: 10/27/2010 12:17 PM Subject: Bethel Rd - S Retain Wall Repair Ltr for 0 -150', w to e Attachments: 102610 S Retain Wall Inspection from ReedCon.pdf Keith, Attached is the letter received from the site visit made to the project from Stan Reed for the S Retaining Wall Repair, from 0 -150 If, west to east. Thank you, Dean Dumke Sr Project Manager #469- 223 -7879 J RJ PAVING, L. P. Reedcon, Inc. — Texas Firm F -2867 P.O. Box 865107 Plano. Texas 75086 -5107 (972) 596 -2852 (972) 867 -2450 Fax October 26, 2010 North Texas Bridge Co., Inc. Attn. Mr. Steve Goodman Re: Retaining Wall Modifications Inspection Bethel Road Coppell, Texas Our Job Number: 2010 064 Dear Mr. Goodman: At your request, I visually inspected the modifications to the existing retaining wall located on the south side of Bethel Road on October 26, 2010. The reinforcing steel appears to be placed properly with one exception. The tall "L" shaped #5 bars @ 7'/2 had been placed at 12" o.c. Your personnel had already seen this and had changed most of these bars to the proper spacing. The remainder of these bars must be spaced properly before placement of the concrete. The expansion joint material placed in the footing should also be extended up through the stem of the modifications. (See attached photo.) The remainder of the steel reinforcing meets the requirements of our modification drawings. Sincerely Yours, Stan Reed, P.E. Texas 33685 Vice - president THE SEAL APPEARING ON THIS DOCUMENT WAS AUTHORIZED BY STAN REED, P.E. 33685, ON OCTOBER 26, 2010. ky", STAN REED 33685 AI�� Attachment � if i a. � ti ,�� f . , � J. -�'el �d ^�,�j�M �� � _