Loading...
ST0301A-CS101109 Page 1 of 2 Keith Marvin - FW: BETHEL AND DENTON-TAP SIGNALS From:   "Dean Dumke" <deand@JRJPaving.com> To:   "Keith Marvin" <kmarvin@coppelltx.gov> Date:   11/9/2010 6:26 PM Subject:   FW: BETHEL AND DENTON-TAP SIGNALS CC:   "Johnny Heine" <johnny@melselectric.com>   Keith, See below email from Per, sent to Johnny Heine, Mels Electric.  I do not know exactly what this switch will entail, but would like to see if we can get Coppell PD involved with whatever assistance is needed during this switch on Thursday.  Sounds like they want to do the switch at 9am and the time it will take is 2 to 4 hours to make this switch.  Please let me know if you can help in getting Coppell PD to help with traffic control. Thank you, Dean Dumke Sr Project Manager #469-223-7879 JRJ PAVING, L. P. _______________________     From: Per Birdsall [mailto:pbirdsall@coppelltx.gov] Sent: Monday, November 08, 2010 7:37 AM To: Johnny Heine Subject: RE: BETHEL AND DENTON-TAP SIGNALS   I spoke with the engineer. Sounds like a go. Only topic of discussion was wether PD should be there. I said it would be preferable.  Per   So far no objections to the plan. We will need to make interruptions to the City's network connection as brief as possible. It will involve two brief interruptions. We will disconnect the switch and loop the patch cable back to the trunk. At this point you can do what you need to do with the cabinet because the network will be patched through. After the new cabinet is in place and running we can reinstall the switch back in the loop.   I'm still waiting to speak with the project engineer who shouldn't be opposed to this schedule unless there is another factor I haven't considered.   file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4CD9923ACity_...1/28/2011 Page 2 of 2 Per >>> Johnny Heine <johnny@melselectric.com> 11/5/2010 10:10 AM >>> 2 to 4 hours we will do the cabinet first and if we have time we will do the pole if not we will do the pole on Friday -----Original Message----- From: Per Birdsall [mailto:PBIRDSALL@coppelltx.gov] Sent: Friday, November 05, 2010 10:04 AM To: Johnny Heine Subject: Re: BETHEL AND DENTON-TAP SIGNALS How long will the signal be off?  -----Original Message----- From: Johnny Heine <johnny@melselectric.com> To: Per Birdsall <PBIRDSALL@coppelltx.gov> Cc: Dean Dumke <deand@JRJPaving.com> Cc: Mark Obarr <mark@melselectric.com> Sent: 11/5/2010 9:52:54 AM Subject: BETHEL AND DENTON-TAP SIGNALS We would like to schedule changing out the cabinet and signal pole next Thursday 11th at 9:00 am. Will this be ok? file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4CD9923ACity_...1/28/2011