Loading...
ST0301A-CS101111 (2) Page 1 of 5 Keith Marvin - RE: Bethel Rd: Letter for Contractor to proceed with work From:   "Marty Murphy" <Martym@JRJPaving.com> To:"Clay" <Clay@outdoorsignature.com>, "Dean Dumke" <deand@JRJPaving.com>, "Joseph     M. Altadonna" <joemaltadonna@yahoo.com> Date:   11/11/2010 12:32 PM Subject:   RE: Bethel Rd: Letter for Contractor to proceed with work CC:   "Keith Marvin" <kmarvin@coppelltx.gov>   Clay,   I visited the site today and noticed that the sign in the median had been partially demolished. I also noticed one of your trailers adjacent to the median. I thought it was apparent that we did not have an agreement for you to begin this work until after our contract was completed and accepted by the City. You do not have my permission to be on this site, nor have you provided me an insurance certificate. I am requesting that you remove the debris that you have demolished and remove your equipment and crews from this site immediately. If you persist to work I will issue a cease and desist order and the City Inspector will have your permit revoked.   Marty   From: Clay [mailto:Clay@outdoorsignature.com] Sent: Friday, October 29, 2010 10:41 AM To: Dean Dumke; Joseph M. Altadonna Cc: Marty Murphy Subject: RE: Bethel Rd: Letter for Contractor to proceed with work       From: Dean Dumke [mailto:deand@JRJPaving.com] Sent: Friday, October 29, 2010 10:41 AM To: Clay; Joseph M. Altadonna Cc: Marty Murphy Subject: RE: Bethel Rd: Letter for Contractor to proceed with work   Clay and Joe,   JRJ will need some specific information so that Marty Murphy, my boss, can send you a letter regarding working in the areas you have contacted to perform.  The City of Coppell’s stance is that until all work has been completed and accepted, JRJ is responsible for any damage to any portion of the project.  In speaking with Marty, he has asked that the following information be sent to him so that he may generate a letter that will allow your contractor to begin work:   Subdivision Legal Name Contractors complete information – Outdoor Signature LLC. 1624 East FM 407 Argyle 75626 Texas – 1612 North Yale Blvd Richardson 75081. Time frame in which work will be completed in the areas as it relates to the Bethel Rd project – Approx 4 weeks (weather permitting)   Once this has been received, Marty will generate a letter which will need to be signed by all parties stating that any damaged areas will be repaired.  If you have any questions regarding what is needed, please respond to this email so that Marty may answer your questions and/or contact you. file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4CDBE26FCity_...1/28/2011 Page 2 of 5   Thank you,   Dean Dumke Sr Project Manager #469-223-7879 JRJ PAVING, L. P. _______________________       From: Dean Dumke Sent: Friday, October 29, 2010 10:01 AM To: 'Clay'; Joseph M. Altadonna Cc: Susan Baker; Fox, Vivian Subject: RE: Bethel Rd: replacement of shrubs at The Reserve   I left a message for number listed below, which I assume is Clay’s.  I have never spoken with Clay and this is the first time I even had a contact number.  Please have Clay contact me on my mobile, the 469 number.  In regards to start time and other items, we are looking at shooting for 4 weeks out to be close to finaling project, weather permitting.  I also spoke with my boss regarding the minor wall separation and he had mentioned that he had addressed this previously with the City Inspector, Larry, and the current condition was pre-construction state.  I would like to complete the grading in this area and make sure that there is no additional movement to it, because the grades do change due to the new wall in the area.  I will meet with Clay, but today will be tight.  Have him contact me and we can schedule a meeting on site.   Thank you,   Dean Dumke Sr Project Manager #469-223-7879 JRJ PAVING, L. P. _______________________       From: Clay [mailto:Clay@outdoorsignature.com] Sent: Friday, October 29, 2010 9:35 AM To: Joseph M. Altadonna; Dean Dumke Cc: Susan Baker; Fox, Vivian Subject: RE: Bethel Rd: replacement of shrubs at The Reserve   Joe,   I did leave a quick message if you have time to speak. I am planning on 2pm if that still makes sense but let me know what is best for you and I do want to be sure I have all you need so if you have a minute to speak feel free to call me direct on 972 636 1795. If not I look forward to seeing you all, either way is fine.   Thanks much,     From: Joseph M. Altadonna [mailto:joemaltadonna@yahoo.com] Sent: Friday, October 29, 2010 9:29 AM file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4CDBE26FCity_...1/28/2011 Page 3 of 5 To: Dean Dumke; Clay Cc: Susan Baker; Fox, Vivian Subject: Re: Bethel Rd: replacement of shrubs at The Reserve   Dean, Im sure we will get this done on the landscape side (thanks)... different issue--- I am of the belief you and Clay have connected for other construction issues related to the entrance??? I have a meeting today with HOA members and Clay to address start time, wall repair, time-lines, etc. and much of these are dependent on your discussion with Clay. If this has not or won't occur prior to 2PM today, then Clay I'm not sure our meeting today is meaningful. not Susan, is there anything in the proposal you seek clarity or detail on from a price perspective? thanks all, I'll await word...   Joe Altadonna 972-742-0040 cell joemaltadonna@yahoo.com     From: Dean Dumke <deand@JRJPaving.com> To: Joseph M. Altadonna <joemaltadonna@yahoo.com> Sent: Fri, October 29, 2010 8:19:03 AM Subject: RE: Bethel Rd: replacement of shrubs at The Reserve I'm sure we can walk with David and get what we need accomplished.  We can talk and/or meet later. Dean Sent from my HTC Touch Pro2 on the Now Network from Sprint®. -----Original Message----- From: Joseph M. Altadonna <joemaltadonna@yahoo.com> Sent: Thursday, October 28, 2010 7:01 PM To: Dean Dumke <deand@JRJPaving.com> Subject: Re: Bethel Rd: replacement of shrubs at The Reserve will do, also forwarded to David...I have a hard stop at 9:30 as I have to be in Ft Worth by 10 Joe Altadonna 972-742-0040 cell joemaltadonna@yahoo.com ________________________________ From: Dean Dumke <deand@JRJPaving.com> To: Joseph M. Altadonna <joemaltadonna@yahoo.com> file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4CDBE26FCity_...1/28/2011 Page 4 of 5 Sent: Thu, October 28, 2010 5:59:30 PM Subject: Bethel Rd: replacement of shrubs at The Reserve Joe, If you can schedule next Thursday at 8:30am, I will get someone from TEM to attend and we can walk site.  I will send out an invite to you and TEM, if you can get David to attend, just accept meeting time for next Thursday. Thanks, Dean Dumke Sr Project Manager #469-223-7879 JRJ PAVING, L. P. _______________________ ________________________________ From:Joseph M. Altadonna [mailto:joemaltadonna@yahoo.com] Sent: Thursday, October 28, 2010 4:43 PM To: Dean Dumke Subject: Re: replacement of shrubs I wil set it up as soon as possible thanks Joe Altadonna 972-742-0040 cell joemaltadonna@yahoo.com ________________________________ From:Dean Dumke <deand@JRJPaving.com> To: Joseph M. Altadonna <joemaltadonna@yahoo.com> Sent: Thu, October 28, 2010 4:16:42 PM Subject: RE: replacement of shrubs Wow!  We need to set up a meeting on site w/ David and my irrigation/landscaper.  Give me a couple dates and times that work for you and David and we will meet to get some resolve. I am currently in a meeting so cannot call at this time. Dean Sent from my HTC Touch Pro2 on the Now Network from Sprint®. -----Original Message----- From: Joseph M. Altadonna <joemaltadonna@yahoo.com> Sent: Thursday, October 28, 2010 3:12 PM To: deand@jrjpaving.com <deand@jrjpaving.com> Subject: Fw: replacement of shrubs Dean, file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4CDBE26FCity_...1/28/2011 Page 5 of 5 this is what came back from David (landscaping) with respect to damage as a result of cut sprinkler lines, weather, and subsequent construction.  I told David you'd videotaped prior landscape to ensure a measure of "fairness" once the project ended.  He stands by these numbers but I would invite you bring another supplier to the party if you can do better.  What I don't need or want is a finger-pointing match that leads to a poor resolution with my HOA group holding the tab erroneously. Let me know the best way forward.  Also I am meeting with Clay our design guy for the entrance tomorrow.  have you two spoken about start dates, etc and the wall separation?????? Joe Altadonna 972-742-0040 cell joemaltadonna@yahoo.com All the shrubs were all in great shape until they cut the sprinklers wires they had no water that's why they all died because of the heat that we had this summer Sent from my BlackBerry® smartphone with Nextel Direct Connect ________________________________ ________________________________ From: David Cardoza <davidcardoza@ymail.com> To: Joemaltadonna@yahoo.com Sent: Wed, October 27, 2010  6:04:19 PM Subject: replacement of shrubs We have lost 21 Nelly R Stevens at 350.00  45 gal Also about 10 flats of monkey grass at 18.50 10-5 gal indian hawthornes  at 25.50 about 16 flats of mondo grass 18.50 Total for matiral 8086.00 plus Tax  Plus labor         file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4CDBE26FCity_...1/28/2011