Loading...
ST0301A-CN101116 (1/28/2011) Keith Marvin - RE: Bethel Road BridgePage 1 From: "Mark North" <mnorth@arkcontractingservices.com> To: "'Keith Marvin'" <kmarvin@coppelltx.gov> CC: <deand@JRJPaving.com>, "'Glenn W. Campbell, P.E.'" <glenn.campbell@gwcen... Date: 11/16/2010 3:41 PM Subject: RE: Bethel Road Bridge Attachments: Quote CITY OF COPPELL- BETHEL ROAD BRIDGE GABION PROTECTION 11- 2010.doc; BE THEL RD GABION PROTECTION.pdf Keith, Please find attached our concept and price to install the gabion protection under the Bethel Road Bridge. Dean Dumke, JRJ Paving, Inc., ask us to forward our price and concept straight to you. If you have any questions please do not hesitate to call me. If you have any engineering questions feel free to contact Mr. Glenn W. Campbell, GWC Engineering. Thanks, Mark North Ark Contracting Services, LLC 420 South Dick Price Road Kennedale, Texas 76060 817.478.7400 Office 817.478.7438 Fax 817.475.1355 Cell -----Original Message----- From: Keith Marvin [mailto:kmarvin@coppelltx.gov] Sent: Thursday, October 28, 2010 2:04 PM To: mnorth@arkcontractingservices.com; glenn.campbell@oneengineeringgroup.com Cc: deand@JRJPaving.com Subject: Bethel Road Bridge Gentlemen, Thank you for meeting with Larry and I out on Bethel Road this morning. I am attaching the documents we discussed. Please call me with any questions. We look forward to seeing your ideas next week. Keith Keith Marvin, P.E. Project Engineer (972) 304-3681 ARK CONTRACTING SERVICES, LLC. 420 SOUTH DICK PRICE ROAD KENNEDALE, TEXAS 76060 OFFICE 817.478.7400 FAX 817.478.7438 November 16, 2010 JRJ Paving, Inc. Attention: Dean Dumke Re: Bethel Road Improvements City of Coppell, Texas Gabion Bridge Protection Thank you for the opportunity to work with you on the above referenced project. Please find enclosed our quote to install complete and in-place the following scope of work listed below, in accordance with the attached concept drawings, and the listed exclusions and clarifications as follows: Item No. Description Quantity Unit Price Amount 1 Mobilization 1 LS $7,500.00 $ 7,500.00 2 Excavation (Rock) 200 CY $ 35.00 $ 7,000.00 3 Gabions 260 CY $ 210.00 $54,600.00 4 Gabion Mattress 85 CY $ 225.00 $19,125.00 5 Micro-piles 4 EA $ 850.00 $ 3,400.00 6 Tieback Anchors 25 EA $ 700.00 $17,500.00 7 Concrete Waler Beams 27 CY $ 475.00 $12,825.00 8 Concrete Connections 52 LF $ 20.00 $ 1,040.00 9 Earth Fill 125 CY $ 22.00 $ 2,500.00 10 Concrete Demolition 1 LS $1,200.00 $ 1,200.00 11 18 Inch Rock RipRap 17 CY $ 85.00 $ 1,445.00 12 Structural Engineering 1 LS $8,400.00 $ 8,400.00 TOTAL PROJECT COST $136,535.00 Exclusions and Clarifications: 1.This proposal is based upon performing all work with 1 each mobilization. Page 1 of 2 Ark Contracting Services, LLC . 420 South Dick Price Road Kennedale, Texas 76060 11-16-2010 Bethel Road Bridge Gabion Protection City of Coppell, Texas Gabion Bridge Protection 2.Ark Contracting Services, LLC shall furnish sealed engineered shop drawings prepared by a Professional Engineer registered in the State of Texas whom carries a minimum of $1,000,000 errors and omissions insurance. 3.Suitable access, testing, barricade, traffic control and erosion control by others. 4.No performance or payment bonds are included. Bonds can be furnished at cost 5.shall furnish valid certificates of insurance prior to Ark Contracting Services, LLC commencing work. 6.Monthly progress payments in the amount of (same percentage as per prime contract) for work completed and materials delivered. All payments shall be due within five (5) days of contractor’s receipt of payment. Payment to Ark Contracting Services, LLC. for retainage shall be due within five (5) days of contractor’s receipt of payment. 7. This quote is good for thirty days from the date of the proposal. Mark R. North Ark Contracting Services, LLC. Page 2 of 2