Loading...
ST0301A-CS101123 (2/2/2011) Keith Marvin - Bethel Road bridge reopens!Page 1 From: Rhonda Adloo To:Brad Reid; Carol Primeaux; Dispatch SPVR; Dispatchers; Fire; Glenn ... CC:CMO Date: 11/23/2010 4:03 PM Subject: Bethel Road bridge reopens! Larry Davis, Construction Engineer, just announced that the bridge will be open to traffic in approximately 5 minutes. Please make sure all your co-workers who need to know are aware that they no longer have to take the lengthy detour around the construction area. Rhonda Adloo Engineering Department Administrative Technician 972/304-3682 radloo@coppelltx.gov Consider the environment before printing this email.