ST0301A-CS101130
(2/2/2011) Keith Marvin - Bethel: Work signsPage 1
From:
"Dean Dumke" <deand@JRJPaving.com>
To:
"Keith Marvin" <kmarvin@coppelltx.gov>
Date:
11/30/2010 6:32 PM
Subject:
Bethel: Work signs
Nice photography. I am having Dallas Light & Barricade pull all signs
except the ones that are between Denton Tap and Park on Bethel. They
were supposed to pull the detour signs yesterday, but when I saw they
had not by 5pm, I lowered several of the detour signs yesterday evening.
Met with DL&B today and drove them around showing them all the signs not
picked up and they are suppose to have them picked up this evening. I
will monitor tomorrow and stay on top of them getting this taken care
of.
Thanks,
Dean Dumke
Sr Project Manager
#469-223-7879
JRJ PAVING, L. P.
_______________________
-----Original Message-----
From: Keith Marvin [mailto:kmarvin@coppelltx.gov]
Sent: Tuesday, November 30, 2010 5:11 PM
To: Dean Dumke
Subject: Fwd: Work signs
FYI... The residents of the subdivision on Bethel Road east of Denton
Tap would like the signs removed from their area. I've already let him
know that you are still actively working on the project, and they will
be removed before you complete the project.
Keith
Keith Marvin, P.E.
Project Engineer
(972) 304-3681
>>> Mike Tanner <miketanner@dfwrealestate.ws> 11/30/2010 4:48 PM >>>
The Bethel Road/Denton Tap intersection is complete and the Bethel Rd.,
Bridge is complete but the work signs are still in Creekview. I was just
wondering if perhaps the construction crews forgot about the signs.
(2/2/2011) Keith Marvin - RE: Work signsPage 1
From:
"Mike Tanner" <miketanner@dfwrealestate.ws>
To:
"'Keith Marvin'" <kmarvin@coppelltx.gov>
CC:
<dbizzell@verizon.net>
Date:
11/30/2010 5:21 PM
Subject:
RE: Work signs
I know they are actively working way on the other side of Denton Tap but
considering they removed all or most of the signs right at Denton Tap is
doesn't seem like we need those back in our neighborhood in front of our
flowers. It's an eyesore. I'm of the understanding that the work over on
Bethel will be going on for many months to come. Are they going to need
signs back in our neighborhood throughout all of that time? Couldn't they
just have them over in the applicable area on the west side of Denton Tap?
Mike Tanner
Progressive Realty Advisors
214-533-6947
TYPOS and CONFUSING TEXT: I often use dictating software when e-mailing and
writing letters. It's about 90 to 95% accurate and saves me a lot of time,
but occasionally the software misrecognizes the dictation and leaves behind
confusing wording, alternate spelling, or sometimes entire phrases that
don't make sense. I try to check for this but from time to time it goes
unnoticed. I apologize if this happens. Please let me know if there's
anything in this e-mail that I need to clarify.
-----Original Message-----
From: Keith Marvin [mailto:kmarvin@coppelltx.gov]
Sent: Tuesday, November 30, 2010 5:09 PM
To: Mike Tanner
Cc: Don Bizzell
Subject: Re: Work signs
Mike,
The contractor is still actively working on the Bethel Road project. They
will remove the signs before they are through with the project.
Keith
Keith Marvin, P.E.
Project Engineer
(972) 304-3681
>>> Mike Tanner <miketanner@dfwrealestate.ws> 11/30/2010 4:48 PM >>>
The Bethel Road/Denton Tap intersection is complete and the Bethel Rd.,
Bridge is complete but the work signs are still in Creekview. I was just
wondering if perhaps the construction crews forgot about the signs.