Loading...
ST9304-CS 860721T E R R A July 21, 1986 Mr. Ed Powell City Engineer City of Coppell 616 S. Coppell Road Coppell, Texas 75019 Re: Intersection Belt Line Road and MacArthur Boulevard Dear Ed: We have selected Texas Bitulithic Company, a division of APAC - Texas, Inc., as the contractor for the above referenced project. In the contract between Riverchase Joint Venture and the City, on the above referenced project, it is stated that the contractor must be reasonably acceptable to the City. If Texas Bitulithic Company is an acceptable contractor, please so indicate by siqn- lng in the space provided below and returning this letter to me. If you have any questions, please do not hesitate to call. Sincere IR Mike Daniel AGREED: IERRA COMPANIES TWO ,INCOLN CENTRE SUITE 1370 5420 IBJ i REEWAY DALLAS, ?~XAS 75240 214 934 9444