Loading...
Sales Tax 09-CS100908 Page 1 of 1 Keith Marvin - Construction Schedule From:   Shane Huffman <shuffman_rkm@yahoo.com> To:   Keith Marvin <kmarvin@coppelltx.gov> Date:   9/8/2010 4:19 PM Subject:   Construction Schedule CC:   Rick O'Dell <rodell@ci.coppell.tx.us> Attachments:   1171 Coppell.xls   Keith   Attached is a schedule that I think we can build the job by, weather permitting.  It does not have any dates on it but is week by week with each location seperate.   Shane Huffman RKM Utility Services, Inc. General Superintendent cell:214-236-5658 office:972-241-2621 fax:972-241-2624 file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4C87B776City_of...2/3/2011 Construction Work Schedule Project Name:COPPELL 2009 STREET REPLACEMENT RKM Utility Services Inc. Work Order Number: Contractor's Name:RKM UTILITY SERVICES, INC. Proposed Work Schedule: Date of Contract: As of:Reviewed by City Inspector: Project Components:1 wk1 wk1 wk1 wk1 wk1 wk1 wk1 wk1 wk1 wk1 wk1 wk1 wk1 wk1 wk1 wk1 wk1 wk1 wk1 wk1 wk1 wk1 wk1 wk1 wk1 wk1 wk HERTZ ROAD (150days) SEWER WATER EXCAV / LIME 1/2 PAVING / SIDEWALK EXCAV / LIME 1/2 PAVING / SIDEWALK STRIPING / CLEANUP CLEAR CREEK (180 days) SEWER STORM DRAIN / INLETS WATER EXCAV / LIME 1/2 PAVING / SIDEWALK EXCAV / LIME 1/2 PAVING / SIDEWALK CLEANUP