Loading...
Sales Tax 09-CS100917 (2/3/2011) Keith Marvin - Re: Fwd: Dobecka dr water.Page 1 From: Albert Samaniego To:Marvin, Keith Date: 9/17/2010 7:35 AM Subject: Re: Fwd: Dobecka dr water. yeah that sounds like the best plan right now. so are we gonna let conatser shut down the water line this morning to make that tie in? >>> Keith Marvin 9/16/2010 5:15 PM >>> Albert, I think this is a good compromise. What do you think? Keith >>> Eric Grant <eric@conatserconstruction.com> 9/16/2010 5:10 PM >>> Keith, We propose to cut in a tee & 1 - 8" valve (@ contract cost of $900.00) just south of the inlet on the east side. This will allow the residents time without water to be limited compared to other proposed options. At the city's request we will load the new water line by a 2" connection between the fire hydrants. After chlorination we will flush by operating the new valve. If any issues arise while tying over services, this will allow the rest of the residents to remain in service until we get to them. Please respond as soon as possible. Thank you, Eric Grant Conatser Construction TX, L.P.