Sales Tax 09-CS100918
(2/3/2011) Keith Marvin - Re: Sanitary sewer on Dobecka drPage 1
From:
Eric Grant <eric@conatserconstruction.com>
To:
Keith Marvin <kmarvin@coppelltx.gov>
Date:
9/18/2010 9:36 AM
Subject:
Re: Sanitary sewer on Dobecka dr
Depending on how far back ss services have to be adjusted, if we have to relay 80-90 % of a long service
we will want compensation? But all the rest will be inclusive.
On Sep 18, 2010, at 8:47 AM, Keith Marvin <kmarvin@coppelltx.gov> wrote:
> Eric,
>
> We're ok with your price as long as it is inclusive of embedment, backfill, service adjustment if required,
etc. I'll have to do a change order to pay you for it, but I'm ok with you moving forward with it.
>
>
>
> Keith Marvin, P.E.
> Project Engineer
> (972) 304-3681
>
>
>
>>>> Eric Grant <eric@conatserconstruction.com> 9/17/2010 8:47 AM >>>
> Keith,
> To replace the 2 sagging areas in the ss main, the price is $48.00/per foot. Albert said there is about 60'
that needs to be replaced = $2880.00. Please let me know. Thank you,
>
> Eric Grant
>
>
>
>