Loading...
Sales Tax 09-CS100918 (2/3/2011) Keith Marvin - Re: Sanitary sewer on Dobecka drPage 1 From: Eric Grant <eric@conatserconstruction.com> To: Keith Marvin <kmarvin@coppelltx.gov> Date: 9/18/2010 9:36 AM Subject: Re: Sanitary sewer on Dobecka dr Depending on how far back ss services have to be adjusted, if we have to relay 80-90 % of a long service we will want compensation? But all the rest will be inclusive. On Sep 18, 2010, at 8:47 AM, Keith Marvin <kmarvin@coppelltx.gov> wrote: > Eric, > > We're ok with your price as long as it is inclusive of embedment, backfill, service adjustment if required, etc. I'll have to do a change order to pay you for it, but I'm ok with you moving forward with it. > > > > Keith Marvin, P.E. > Project Engineer > (972) 304-3681 > > > >>>> Eric Grant <eric@conatserconstruction.com> 9/17/2010 8:47 AM >>> > Keith, > To replace the 2 sagging areas in the ss main, the price is $48.00/per foot. Albert said there is about 60' that needs to be replaced = $2880.00. Please let me know. Thank you, > > Eric Grant > > > >