Go ahead and adjust the horizontal alignment as necessary to avoid the conflict. Please reflect this on
your as-builts.
Keith
-----Original Message-----
From: <shuffman_rkm@yahoo.com>
To: Keith Marvin <KMARVIN@coppelltx.gov>
To: <shuffman_rkm@yahoo.com>
Sent: 10/14/2010 12:22:14 PM
Subject: Re: Heartz Road
I can't think of any problems that this creates for us. Moving the line to the east 3-5' works for us.
Sent via BlackBerry by AT&T
-----Original Message-----
From: "Keith Marvin" <KMARVIN@coppelltx.gov>
Date: Thu, 14 Oct 2010 12:04:05
To: Richard Odell<RODELL@coppelltx.gov>; <shuffman_rkm@yahoo.com>
Cc: Albert Samaniego<ASAMANIEGO@coppelltx.gov>; Chris.B..Seely<cseely@tnp-online.com>
Subject: Fw: Heartz Road
Shane,
See the below email from the design engineer. I have no objection to moving over to avoid the gas
conflict. Does this pose any problem for you that we may not be considering?
Keith
(2/7/2011) Keith Marvin - Re: Heartz RoadPage 1
From:
<shuffman_rkm@yahoo.com>
To:
"Keith Marvin" <kmarvin@coppelltx.gov>
Date:
10/14/2010 12:27 PM
Subject:
Re: Heartz Road
I can't think of any problems that this creates for us. Moving the line to the east 3-5' works for us.
Sent via BlackBerry by AT&T
-----Original Message-----
From: "Keith Marvin" <KMARVIN@coppelltx.gov>
Date: Thu, 14 Oct 2010 12:04:05
To: Richard Odell<RODELL@coppelltx.gov>; <shuffman_rkm@yahoo.com>
Cc: Albert Samaniego<ASAMANIEGO@coppelltx.gov>; Chris.B..Seely<cseely@tnp-online.com>
Subject: Fw: Heartz Road
Shane,
See the below email from the design engineer. I have no objection to moving over to avoid the gas
conflict. Does this pose any problem for you that we may not be considering?
Keith
Page 1 of 1
Keith Marvin - Heartz Road
From: "Chris B. Seely" <cseely@tnp-online.com>
To: "Keith Marvin" <kmarvin@coppelltx.gov>
Date: 10/14/2010 12:00 PM
Subject: Heartz Road
CC: "Matt Atkins" <matkins@tnp-online.com>
Keith:
Per your call, I have looked at the sewer location in the plans. I do not have any issue with moving the sanitary
sewer line to the east. The existing storm sewer and water lines are on the east side of the roadway, so we will
be clear of these utilities. The contractor should be able to move the sewer line 3 to 5 ft to the east as needed to
get away from the gas line and stay within this area of construction. Regarding the manholes, I am fine with
abandonment of the existing manholes or removal if the gas line is not in conflict. We will make the necessary
changes on the record drawings.
Thanks!
Chris
Chris Seely, P.E.
(TX)
Project Manager
TEAGUE NALL AND PERKINS, INC
.
12160 North Abrams Road Suite 508
Dallas, Texas 75243
214.461.9867 phone
214.461.9864 fax
cseely@tnp-online.com
www.tnp-online.com
file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4CB6F0C2City_o...2/7/2011