Loading...
Sales Tax 09-CS101021 (2/7/2011) Keith Marvin - Re: 109 Dobecka Drive - 10-21-10Page 1 From: "J. J. Jamadar" <jjjamadar@verizon.net> To: "Keith Marvin" <kmarvin@coppelltx.gov> CC: "JJ Jamadar" <jj@mayscompany.com> Date: 10/21/2010 8:19 PM Subject: Re: 109 Dobecka Drive - 10-21-10 Dear Keith, This is JJ at 109 Dobecka Drive. I have noticed that the contractor has saw cut my driveway an additional 4' toward the house on the West side. They also have cross cut this 4' section in two places so the end of the existing driveway is now in 3 pieces at each end of the semi-circular drive. I trust this has been done so they felt the need to replace an additional 4' of drive to accomodate the slope or some other reason. I want to make sure they do not leave this driveway cut up and only add joint sealer in the cuts. These cuts are the full depth of the paving. Please confirm that these 4' sections of paving will be removed and replaced. Thank you!!!!!! JJ Jamadar. ----- Original Message ----- From: "Keith Marvin" <kmarvin@coppelltx.gov> To: <gdobecka@coppellisd.com>; <keith@ohlenair.com>; <billy.faught@verizon.net>; <j.hoerth@verizon.net>; <jjjamadar@verizon.net>; <m.mcclew@verizon.net>; <tbranchtx@verizon.net> Cc: <eric@conatserconstruction.com>; "Albert Samaniego" <ASAMANIEGO@coppelltx.gov>; "Ken Griffin" <KGRIFFIN@coppelltx.gov>; "Tim Oates" <TOATES@coppelltx.gov> Sent: Wednesday, October 20, 2010 4:27 PM Subject: Dobecka Drive > Good afternoon. > > I wanted to touch base with everyone on the ongoing reconstruction of > Dobecka Drive. As you know, they placed concrete on a little more than > half the road last Wednesday. Unfortunately we haven't seen much of them > since then. I spoke with the project manager this morning, and he assures > me that now that they have reached their 7 day cure time for the concrete > they will once again be here working diligently. > > Beginning tomorrow they will be removing forms from the street, and > forming the driveways on the west side of the road. Continuing through > Wednesday of next week they will be placing concrete in these driveways > and the sidewalk along this side. They then plan to cut out the old > paving on the east side of the road beginning next Thursday. They expect > to be able to place the concrete for that side of the road as early as the > week of November 3rd. Driveways and sidewalks should follow on the east (2/7/2011) Keith Marvin - Re: 109 Dobecka Drive - 10-21-10Page 2 > side the following week. > > Barring any unforseen circumstances, or weather delays, Contaser expects > to be done with the project by Thanksgiving. Thank you for your continued > patience throughout this project. > > Feel free to call me with any questions. > > > >