Loading...
ST1001-CS110124 A r Texas Department of Transportation P.O. BOX 133067 • DALLAS, TEXAS 75313 -3067 • (214) 320 -6100 January 14, 2011 Control: 2374 -07 Highway: IH 635 Limits: Royal Ln County: Dallas Mr. Ken Griffin, P.E. Dir. of Engineering & Public Works City of Coppell PO BOX 9478 Coppell, TX 75019 Dear Mr. Griffin: Our office has conducted a traffic signal warrant study for IH 635 at Royal Ln in the City of Coppell. From our review, based on prohibiting traffic turning left out of Gateway Blvd, we are authorizing signals at this location. Attached is a signed Traffic Signal Authorization Form for the above noted location. Please feel free to contact Ms. Roxanne Cortez, P.E. at (214)320- 6621, if needed. Sincere) , / 10 Melanie Young, P.E. L. District Transport- Operations Engineer Attachments THE TEXAS PLAN REDUCE CONGESTION • ENHANCE SAFETY • EXPAND ECONOMIC OPPORTUNITY • IMPROVE AIR QUALITY INCREASE THE VALUE OF OUR TRANSPORTATION ASSETS An Equal Opportunity Employer -/O.P- Traffic Siunaa Authorization Form Texas Department of Transportation tn Forrn Revised 3 /18/2003 City Name* or Rural Area Countv County No. District Coppell Dallas _ _ 057 DAL Population by latest federal census *: 35,958 * If unincorporated city, show "Unit. "; population not required. Control Ref. Hwy. No. & Street Name (if any) Mile Point Section Marker Major St.: IH 635 8.478 2374 -07 Freeway frontage road? 151 Yes n No Minor St.: Royal Lane Freeway frontage road? n Yes X No Signal Requested: n Flashing Beacon Fl Traffic Signal n Other Request of (date): 11/22/2010 by: X City n County 1 1 TxDOT Individual t District Traffic Section Recommendations: n None n Flashing Beacon Z Traffic Signal ❑ Other } 1 Remarks: TxMUTCD Warrant(s) met (check): XI 1 X 2® 3 n 4 F n 6 7 8 Maintenance by: 1X1 City n County n TxDOT Installation by: n City r County 1 1 TxDOT (I Contract £ t Funding by: District Maintenance Funds G x t ( Urban (HES) f n Preventive Maintenance Program (CPM) P 1 Other (specify) t g Estimate s : $ 150,000 Proposed Letting Date: FY 11 i V 1 1 Blain 063 Traffic Se ion Sign (sate) Project Manager & No. I f Remarks: Recommendations A proved: kb) i District Engineer (date) d Send one copy to the Traffic Operations Division (TRF -TE) for permanent file. •