Sales Tax 09-CS101109 (8/17/2011) Keith Marvin - Re: Street Improvement Project - Clear Creek LanePage 1 From: Keith Marvin To:silvertulips Date: 11/9/2010 2:48 PM Subject: Re: Street Improvement Project - Clear Creek Lane Attachments:Clear Creek Public Meeting agenda.doc Ms. Davis, The contractor, RKM Utilities, began work this week. The project involves the installation of new water, sewer, and storm drainage lines, and the removal and replacement of the street and sidewalk paving. The contractor has 180 calendar days to complete the project. It will be constructed in phases, and the road will remain passable during the construction. I'm attaching a copy of the agenda from the meeting last week. If you would like to discuss this project in greater detail, or see the plans for the work, please feel free to call me. Keith Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> silvertulips <silvertulips@gmail.com> 11/9/2010 9:39 AM >>> Hello Mr. Marvin, I was unable to attend the Nov 4 meeting between the residents of Cleart Creek Ln, the Engineering staff, and the Ccontractor to learn about the specifics of this project. As such, would it be possible for you to provide the following information via a response to this email? 1) What is the scope / nature of the improvements planned for this project? 2) What is the expected completion date of the project? This information is very important to me because I work from home and need to make plans for how to deal with the construction noise in light of my conference call schedule. Kind Regards, Jennnifer Davis 474 Clear Creek Ln. 972-471-1152 MEMORANDUM TO: Tax 2009 Folder – Clear Creek FROM: Keith R. Marvin, P.E. DATE: 11/04/2010 REF: Public Meeting Introductions   Keith Marvin – Project Engineer  Chris Seely – Design Engineer  Rick O’Dell – Construction Inspector  RKM Utilities – Shane Huffman (PM)  Residents? Scope of Project:  New 8” water line – New services & meter cans. New 8” Sewer line – new sewer services with cleanout at each Property line New Paving – 6” thick with 8” lime stabilized subgrade 28’ back to back. Sidewalk – 4’ both sides – Preserve the sidewalk that was replaced last year where possible Funding Source: ¼ cent sales tax allocated to streets during November 2007 election Contract amount - $587,597.50 with $40,000 potential bonus for early completion Schedule : Project to begin on or about November 8, 2010. 180 Calendar Day max schedule, providing for a May 2011 completion date. $40,000 allocated for early completion bonus. $1,000 per day penalty for late completion. Access: One-way traffic during construction from Sandy Knoll to Willow Springs. Project will be constructed in 4 phases (quarters). Parking will not be permitted on the leg where the construction is taking place. Contractor will maintain access for residents and emergency services.