Loading...
Sales Tax 09-LR101220nLLIfINCE GEOTECHNICML Wour Acct ID: 1770 Report Date: 12/20/2010 Project: Heartz Road Location: Consulting Engineering * Geotechnical Engineering * Construction Materials 3228 Halifax Street, Suite A, Dallas, Texas 75247 Phone: (972) 444 -8889 Fax: (972) 444 -8893 File No: C10 -1013 Date Sampled: 12/16/2010 Sampled By: Hanks, Marvin By Order Of: Cruz w /RKM Order Number: 1770 Client: The City of Coppell REPORT: Lime Depth Verification LAB NO: 96054 -1 Test Method: See Below TEST RESULTS Report No: 96054 -1 Page 1 of 1 A field representative for Alliance Geotechnical Group, checked the depth of lime treatment of the subgrade after compaction. Depth measurements were performed using a phenolphthalein indicatior to verify compliance with project specifications that require a minimum 6 in. compacted thickness. The test results follow. Sample Depth, No. Location in. I Northbound Heartz Rd. east section - Station 1+90 7.25 2 Northbound Heartz Rd. east section - Station 5 +00 7.50 3 Northbound Heartz Rd. east section - Station 8 +25 7.50 Charge: The City of Coppell Attn. Mr. Keith Marvin. P.E. Orig: The City of Coppell (Coppell. TX) Attn: Mr. Keith Marvin, P.E. (1 -cc copy) 1 -cc The City of Coppell Attn: Rhonda Adloo 1 -cc The City of Coppell Attn: Mr. Rick O'Dell Respectfully Submitted, Alliance Geotechnical Group Perry C. Kakara, Sr. Project Manager THIS REPORT APPLIES ONLY TO THE STANDARDS OR PROCEDURES INDICATED AND TO THE S.AMPLE(S) TESTED AND /OR OBSERVED AND ARE NOT NECESSARILY INDICATIVE OF THE QUALITIES OF APPARENTLY IDENTICAL OR SIMILAR PRODUCTS OR PROCEDURES. FOR DO THEY REPRES:ENl AN ONGOING OU,ILI! Y ASSURANCE PROGRAM UNLESS SO NOTED. THESE REPORTS ARE FOR THE EXCLUSIVE USE OF THE ADDRESSED CLIENT AND ARE NOT TO BE REPROOUCEC 'A -IFHOU i 'vVRITTEN PERMISSION. III I GEOTECHNICML GROUr Acct ID: 1770 Report Date: 12/20/2010 Project: Heartz Road Location: Heartz Rd. Consulting Engineering * Geotechnical Engineering * Construction Materials 3228 Halifax Street, Suite A, Dallas, Texas 75247 Phone: (972) 444 -8889 Fax: (972) 444 -8893 File No: C10 -1013 Date Sampled: 12/15/2010 Sampled By: Gatton, Tim By Order Of: Cruz w/ RKM Order Number: 1770 Client: The City of Coppell Location Wet Density (p cf) REPORT: Nuclear Field Density Test Proctor Number LAB NO: 95976 Moisture Deviation Percent Proctor Density Pass F Test Meth See Below Final Northbound Heartz Rd. at Station 120.2 TEST RESULTS Report No: 95976 94.6 8809 1 Page 1 of 2 107.9 Optimum Maximum 3 +00 Proctor Moisture Dry Density Proctor No Date (%) (pct Color / Description 8809 11/15/2010 30.6 87.7 Light Brown and Gray Sandy Clay Lime Treated Specification Moisture Band Specification No. Compaction, % Minimum Maximum 1 95 -2.0 2.0 Material Test No. Lift # / Depth Location Wet Density (p cf) Moisture Content % Dry Density (pcf) Proctor Number Spec. No. Moisture Deviation Percent Proctor Density Pass F 1 Final Northbound Heartz Rd. at Station 120.2 27.1 94.6 8809 1 -3.5 107.9 Fail 3 +00 2 Final Northbound Heartz Rd. at Station 119.0 31.5 90.5 8809 1 +0.9 103.2 Pass 3 +00 - Retest 6' east 3 Final Northbound Heartz Rd. at Station 115.3 28.7 89.6 8809 1 -1.9 102.2 Pass 6 +10 4 Final Northbound Heartz Rd. at Station 117.0 31.3 89.1 8809 1 +0.7 101.6 Pass 9 +00 5 Final Northbound Heartz Rd. at Station 116.1 31.8 88.1 8809 1 +1.2 100.5 Pass 12 +20 Charge: The City of Coppell Attn: Mr. Keith Marvin, P.E. Ong: The City of Coppell (Coppell, TX) Attn: Mr. Keith Marvin, P.E. (1 -cc copy) 1 -cc The City of Coppell Attn: Rhonda Adloo 1 -cc The City of Coppell Attn: Mr. Rick O'Dell Respectfully Submitted, Alliance Geotechnical Group r Perry C. Kakara, Sr. Project Manager THIS REPORT APPLIES ONLY TO THE STANDARDS OR PROCEDURES INDICATED AND TO THE SAMPLE(S) TESTED AND /OR OBSERVED AND ARE NOT NECESSARILY INDICATIVE OF THE QUALITIES OF APPARENTLY IDENTICAL OR SIMILAR PRODUCTS OR PROCEDURES, NOR DO THEY REPRESENT AN ONGOING QUALITY ASSURANCE PROGRAM UNLESS SO NOTED. THESE REPORTS ARE FOR THE EXCLUSIVE USE OF THE ADDRESSED CLIENT AND ARE NOT TO BE REPRODUCED WITHOUT WRITTEN PERMISSION. ' q__ Acct ID: 1770 Report Date: 12/20/2010 Project: Heartz Road Location: Heartz Rd. Consulting Engineering * Geotechnical Engineering * Construction Materials 3228 Halifax Street, Suite A, Dallas, Texas 75247 Phone: (972) 444 -8889 Fax: (972) 444 -8893 File No: C10 -1013 Date Sampled: 12/15/2010 Sampled By: Gatton, Tim By Order Of: Cruz w/ RKM Order Number: 1770 Client: The City of Coppell REPORT: Nuclear Field Density Test LAB NO: 95976 Test Method: See Below TEST RESULTS Report No: 95976 Page 2 of 2 Gauge No.: 4557 Daily Standard Counts: 12/15/2010 DS: 3020 MS: 503 Remarks: First test failed due to high amount of aggregate in area. Second test retest for first test - moved 6' to east of first test. Test Methods: ASTM D6938 -07 Charge: The City of Coppell Attn: Mr, Keith Marvin, P.E. Orig: The City of Coppell (Coppell, TX) Attn: Mr. Keith Marvin, P.E. (1 -cc copy) 1 -cc The City of Coppell Attn: Rhonda Adloo 1 -cc The City of Coppell Attn: Mr. Rick O'Dell Respectfully Submitted, Alliance Geotechnical Group r Perry C. Kakara Sr. Project Manager THIS REPORT APPLIES ONLY TO THE STANDARDS OR PROCEDURES INDICATED AND TO THE SAMPLE(S) TESTED AND /OR OBSERVED AND ARE NOT NECESSARILY INDICATIVE OF THE QUALITIES OF APPARENTLY IDENTICAL OR SIMILAR PRODUCTS OR PROCEDURES, NOR DO THEY REPRESENT AN ONGOING QUALITY ASSURANCE PROGRAM UNLESS SO NOTED. THESE REPORTS ARE FOR THE EXCLUSIVE USE OF THE ADDRESSED CLIENT AND ARE NOT TO BE REPRODUCED WITHOUT WRITTEN PERMISSION.