Loading...
Sales Tax 09-LR101221 (2)� f1LLIANCE GEOTECNC1ICfiL GFiOUP Acct I D: 1770 Report Date: 12/21/2010 Project: Heartz Road Location: Heartz Rd. Client: The City of Coppell REPORT: Lime Depth Verification Consulting Engineering * Geotechnical Engineering * Construction Materials 3228 Halifax Street, Suite A, Dallas, Texas 75247 Phone: (972) 444 -8889 Fax: (972) 444 -8893 File No: C10 -1013 TEST RESULTS Date Sampled: 12/17/2010 Sampled By: Marvin Hanks By Order Of Cruz w /RKM Order Number: 1770 LAB NO: 96124 -1 Test Method: See Below Report No: 96124 -1 Page 1 of 1 A field representative for Alliance Geotechnical Group, checked the depth of lime treatment of the subgrade after compaction. Depth measurements were performed using a phenolphthalein indicatior to verify compliance with project specifications that require a minimum 6 in. compacted thickness. The test results follow. Sample Depth, No. Location in. 1 Southbound Heartz Rd. east section at 141 Heartz Rd. 7.75 2 Southbound Heartz Rd. east section at 153 Heartz Rd. 7.50 Charge: The City of Coppell Attn: Mr. Keith Marvin. P.E. Orig: The City of Coppell (Coppell, TX) Attn: Mr. Keith Marvin. P. E. (1 -cc copy) 1 -cc The City of Coppell Attn: Rhonda Adloo 1 -cc The City of Coppell Attn: Mr. Rick O'Dell Respectfully Submitted Alliance Geotechnical Group Perry C. Kakara, Sr. Project Manager THIS REPORT APPLIES ONLY TO THE STANDARDS OR PROCEDURES INDICATED AND TO THE SAMPLES) TESTED AND /OR OBSERVED ARID ARE NOT NECESSARILY INDICATIVE OF THE QUALITIES OF APPARENTLY IDENTICAL OR SIMILAR PRODUCTS OR PROCEDURES. NOR DO THEY REPRESENT AN ONGOING QUALITY ASSURANCE PROGRAM UNLESS SO NOTED. THESE REPORTS ARE FOR THE EXCLUSIVE USE OF THE .ADDRESSED CLIENT AND ARE NOT TO BE REPRODUCED VATHOUT bVRITTEN PERMISSION