Loading...
ST8806-CS 890503 GINN, INC. CONSULTING ENGINEERS Mr. Russell Doyle, P.E. City of Coppell P.O. Box 478 Coppell, TX 75019 Re: Parkway Blvd. Improvements East of Denton Tap Road Dear Mr. Doyle: We have received the work order from your office on April 28, 1989 authorizing us to begin work on the above referenced project. In response to your request for a time schedule anticipated we offer the following. The surveying is currently in progress to obtain accurate cross- sections and related information on the existing site conditions. This information will be used in re-evaluating the original design for this section of roadway and allowing for any adjustments in that original design as required. The plans should be completed by May 19, 1989. After the plans are completed, we shall be prepared to meet with you on May 26, 1989 to discuss the City's options for initiating construction (ie., public bidding versus change order). The schedule for construction and completion shall be contingent upon which option the City selects for initiating construction~ and therefore, cannot be forecasted at this time. Please call if you have any additional questions. Sincerely, Kevin Peiffer,'P.E. KP/dsp cc: Dan Dowdy, P.E. H. Wayne Ginn, P.E. File 89412 17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900