Loading...
Sales Tax 09-LR110110E G M Wour Acct I D: 1770 Report Date: 01/10/2011 Project: Clear Creek Location: Clear Creek St. Client: The City of Coppell REPORT: Lime Depth Verification Consulting Engineering * Geotechnical Engineering * Construction Materials 3228 Halifax Street, Suite A, Dallas, Texas 75247 Phone: (972) 444 -8889 Fax: (972) 444 -8893 File No: C10 -1014 Date Sampled: 01/05/2011 Sampled By: McDonald, Jack By Order Of: Rick O'dell Order Number: 1770 WE.111[4� W:1rL:& T est M et h od: See Below TEST RESULTS Report No: 96783 Page 1 of 1 A field representative for Alliance Geotechnical Group, checked the depth of lime treatment of the subgrade after compaction. Depth measurements were performed using a phenolphthalein indicator to verify compliance with project specifications that require a minimum 6 in. compacted thickness. The test results follow. Sample Depth, No. Location in. 1 Clear Creek St. southbound - Station 2 +00 7.00 2 Clear Creek St. southbound - Station 4 +25 7.00 3 Clear Creek St. southbound - Station 6 +50 7.25 Orig: The City of Coppell (Coppell, TX) Atin Mr. Keith Marvin, P.E. (1 -cc copy) 1 -cc The City of Coppell Attn: Mr. Rick O'Dell Respectfully Submitted, Alliance Geotechnical Group Perry C. Kakara, Sr. Project Manager THIS REPORT ,APPLIES ONLY TO THE STANDARDS OR PROCEDURES INDICATED AND TO I HE Si;MPLEtS} TESTED AND/OR OBSERVED AND ARE NOT NECESSARILY INDICATIVE OF 1HE QUALITIES OF APPARENTLY IDENTICAL OR SIMILAR PRODUCTS OR PROCEDURES_ NOR DO THEY REPRESENT AN ONGOING QUALITY ASSURANCE PROGRAM UNLESS SO NOTED THESE REPORTS ARE FOR THE EXCLUSIVE USE OF THE ADDRESSED CLIENT AFID ARE NOT TO BE REPRODUCED lA1'I TOUT VvRI 1 EN PERMISSION.