SW09/10-CS100925
Page 1 of 1
Keith Marvin - RE: City Hall Bike Racks
From:
<bobby@calcontex.com>
To: "Keith Marvin" <kmarvin@coppelltx.gov>
Date:
9/25/2010 12:12 PM
Subject: RE: City Hall Bike Racks
Keith,
We can do the work for $850. Let me know if you need this in a formal proposal.
Thanks for the opportunity.
Bobby Bounds
California Construction
23 Bass Pond Drive
Frisco, Texas 75034
972-670-0368 cell
214-618-2943 fax
-------- Original Message --------
Subject: City Hall Bike Racks
From: "Keith Marvin" <kmarvin@coppelltx.gov>
Date: Fri, September 24, 2010 4:16 pm
To: <bobby@calcontex.com>
Cc: "Albert Samaniego" <ASAMANIEGO@coppelltx.gov>, "Jerod Anderson"
<JANDERS@coppelltx.gov>, "John Elias" <JELIAS@coppelltx.gov>
Bobby,
The city is planning to install four Bicycle racks at Town Center. I would like a price quote to
install 4 - 7' x 7' concrete pads as shown in the attached drawing. The concrete section will
be identical to the sidewalk work you have been pouring under the sidewalk contract - 4"
3,000psi concrete with #3 rebar at 18"ccew. We will ask our Parks Department to clear any
irrigation conflicts prior to pouring the concrete.
Please call me with any questions. We can meet out there to look at the locations next week
if you like.
Thanks,
Keith
Keith Marvin, P.E.
Project Engineer
(972) 304-3681
file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4C9DE72ACity_...2/14/2011