ST8805-CS 890726GINN, INC.
CONSULTING ENGINEERS
July 26, 1989
Mr. Russ~l Doyle, P.E.
City of~oppell
Copp~l, TX 75019
Re: Parkway Blvd. (west of Denton Tap Road)
Dear Mr. Doyle:
We have reviewed the Temporary Lane Channelization plan for
Parkway Blvd. dated July 21, 1989 submitted to us by Jerry Parche
Consulting Engineers at the direction of Larry Davis. We have no
objections to this plan.
It is our understanding from a telephone conversation with Mr.
Parche that signage issues have been addressed by City Staff.
Please call me if you have questions.
Sincerely,
John C. Karlsruher, P.E.
Senior Engineer
JCK/dsp
cc:
Jerry Parche, P.E.
H. Wayne G~nn, P.E.
Gabe Favre
File 89305
17103 Preston Road ® Suite 100 · LB 118 ® Dal!~ Texas 75248 ® Phone 214/248-4900