Loading...
ST0501-ES110221 T H E C 1 T Y O F COPPELL February 21, 2011 Sila and Georgette Salloum 601 Castle Creek Dr Coppell TX 75019 -6126 RE: Deforest Road, Project #ST 05 -01 Dear Mr. and Mrs. Salloum: As I hope you are already aware, the city has begun the process to reconstruct Deforest Road from MacArthur Blvd. to Windsor Estates. The existing asphalt roadway will be removed and replaced with a 28 -foot wide concrete street with curbs and improved drainage. The drainage ditches along the side of the road will be filled in, and storm sewer inlets and sidewalks will be constructed within the roadway. The completed project will improve traffic conditions, safety, pedestrian access and drainage. The intersection of MacArthur Boulevard and Deforest Road will also be signalized. It has come to my attention that the proposed work will require grading on your property. The purpose of the grading is to eliminate the existing drainage ditch. Please contact me at your earliest convenience to discuss the project. That way I can go further into detail with you about the proposed work. My direct number is 972 - 304 -3562 and I am looking forward to hearing from you soon. Sincerely, George Marshall, P.F. Civil Engineer A FAMILY COMMUNITY FOR A LIFETIME 255 PARKWAY * P.O. BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * WWW.COPPELLTX. GOV