Loading...
Sales Tax 09-LR110214CIA GEOTECHMICML Wour Acct I D: 1770 Report Date: 02/14/2011 Project: Clear Creek Location: Clear Creek Client: City of Coppell REPORT: Lime Depth Verification Consulting Engineering * Geotechnical Engineering * Construction Materials 3228 Halifax Street, Suite A, Dallas, Texas 75247 Phone: (972) 444 -8889 Fax: (972) 444 -8893 File No: C10 -1014 Date Sampled: 02/11/2011 Sampled By: Hanks, Marvin By Order Of: Rick O'dell Order Number: 1770 LAB NO: 97483 -1 Test Method: See Below TEST RESULTS Report No: 97483 -1 Page 1 of 1 A field representative for Alliance Geotechnical Group, checked the depth of lime treatment of the subgrade after compaction. Depth measurements were performed using a phenolphthalein indicatior to verify compliance with project specifications that require a minimum 6 in. compacted thickness. The test results follow. Sample Depth, No. Location in. 1 Westbound 491 Clear Creek 6.75 2 Westbound 471 Clear Creek 7.00 3 Westbound 459 Clear Creek 6.75 Ong: City of Coppell (Coppell, TX) Attn: Mr. Keith Marvin, RE- (1 -cc copy) 1 -cc City of Coppell Attn: Mr. Rick O'Dell Respectfully Submitted, Alliance Geotechnical Group i Perry C. Kakara, Sr. Project Manager THIS REPORT APPLIES ONLY TO THE STANDARDS OR PROCEDURES INDICATED AND TO THE SAMPLES) TESTED AND /OR OBSERVED AND ARE iJOT NECESSARILY INDICATIVE OF THE QUALITIES OF APPARENTLY IDENTICAL OR SIMILAR PRODUCTS OR PROCEDURES, NOR DO THEY REPRESENT AN ONGOING QUALITY ASSURANCE PROGRAM UNLESS SO NOTED. THESE REPORTS ARE FOR THE EXCLUSIVE USE OF THE ADDRESSED CLIENT .AND ARE HOT TO BE REPRODUCED \MTHOUT VAiRITTEN PERMISSION.