Loading...
WA9903-CS000118SHIMEK, JACOBS & FINKLEA, L.L.P. CONSULTING ENGINEERS DALLAS, TEXAS 76110 Re: City of Coppell, Texas Village Parkway Pump Station We are transmitting herewith 3 copies of the submittal data furnished by These copies have been reviewed and marked as follows: No No. Exceptions Dwg. No. Sheets Dwg. Description Taken Rejected 5 Concrete Resubmittal X 4 Flex Coupling X Date: January 18, 2000 Architectural Utilities, Inc. Explanation ' Make Revise Submit Corrections and Specified Noted Resubmit Items Remarks: By copy of this letter we are returning 2 copies of the submittal to Mr. Larry Davi ppell ~"' By: 'arrYD2i~ ~ Checking of shop drawings by Shimek, Jacobs & Finklea is only for general conformance with the design concept of the project and general compliance with the information given in the contract documents. Any action shown is subject to the requirements of the plans and specifications. Contractor is responsible for: dimensions which shall be confirmed and correlated at the job site; fabrication processes and techniques of construction; coordination of his work with that of all other trades; and performing his work in a safe and satisfactory manner. J:\Coppell\1999-153XL\design~Xshopdwgl.doc