Loading...
ST8805-CS 890613 /" GINN, INC. June 13, 1989~ Mr. Run, x1 Doyle, P.E. Co~ll, TX 75019 Dear Mr. Doyle: Per your instructions in our m~ting on May 25, 1989, transmitted herewith is Ed Bell Const~ction Co. 's price for adding the above referenced project by change order to ~e Belt Line Roa4 (South) project. As per their letter, ~ese prices are contingent upon this change order not delaying final acceptance and the releasing of their retainage on the Belt Line Road (South) project when that project is completed. Their total price for this project based on the approximate plan quantities is $121,391.20. Please note that this price does not include any median irrigation since that design was not complete yet at the time a price was requested of them. We estimate the irrigation cost to be between $9,000.00 and $11,000.00. This would reflect a total construction cost of approximately $132,000.00. They are requesting 120 calendar days to complete this work as noted on the last page of the price sheet. Please review the price submitted and advise as to the direction the City would like to proceed with at this time (ie., bidding vs. change order). Please call if you have any questions. Sincerely, /~, Kevin E. Pei~3er, KP/dsp cc: File 89412 17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900