Loading...
Willow Park-CS1103112011) Rhonda Adloo - Willow Park Page 1 From: Michael Garza To: jason @jrrosedevelopment.com CC: Larry Davis; Rhonda Adloo Date: 3/11/20119:16 AM Subject: Willow Park Attachments: IMG_2195.JPG; IMG_2209.jpg; IMG_2211.jpg; geotech.gif; geotech2.gif Jason, The following pictures are of the sewer line backfill that is not suitable material. About 80% of this site is not suitable material. Densities should be taken for the backfill material. My understanding is that there have been no geotech labs out there to take densities. We will not accept this and it will need to be removed and replaced. It was my understanding from the pre -con that you were going to cut down the unsuitable material and dispose of it, then in turn, bring in suitable fill material. I have attached a portion of your Geotech's report regarding the unsuitable material. It would be to your advantage to remove this material and replace it with suitable fill material. If you have any questions please contact me at your convenience. thanks, Mike ♦c s - - `'�+'- ti's '. ��' -• Y= '� `� � �.�.. ". a ,�, � t',. 2w`'.: � .� R-.. f - `�' "k eg, ♦ � [ � _ V r� e w S - 1 1 Vr / .. ��. � *i 'h � ti�' �' „�-� ¢ y � �i- x _2 s t. i, qs. R :r i'.' '+•. �'�-+" yt.- E+,, °'� 1�4° I t � r �4 yr �+ 't: N y d a � s 1 I A mo istu re- barrier should be used bene a Ih the, slab foundation in areas whe re f I oo r coverin gs wil I be utilized (such as, but not limited to, wood flooring, tile, linoleurn, and carpeting). Subgrade Preparation Uncontrolled fill was encountered across the site ranging in depth fforn 4 to 6 feet from the existing ground surface. In order to utilize ground supported foundation systems it will be necessary to remove and replace the uncontrolled till with engineering control a0cillows. The fill rnatenal should be excavated and deleterious materials greater than 4 inches in size, or any organics should be removed from the fill. The fill to be replaced should consist of material with at least 60 percent passing the No. 4 sieve- The excavated soils may then be placed in loose lifts not exceeding 10 inches arid cc rnpacted to at least 95 percent of the materials maximum dry density per the standard Proctor test (ASTNI D698) at moisture content of optimum to +4 percent above optimum. Pavemunt Design Recommendations The following pavement sections are a minimi-rim recommended for this project based on a 20-year Fife design. They are based on our engineering judgment and experience with environmental factors, including temperature, humidity, rainfall and swell characteristics of the soils, We recommend a 6-inch section for streets in residential communities. A m in im U m 7-inch section is recommended in areas receiving frequent heavy trucks and clumpsters, Concrete with a minimum H-day compressive strength of 3,500 pounds per square inch is recommended, All topsoil, existing pavernent and structures, vegetation, and any unsuitable materials should be removed. The pavement subgrade should be proafrolled with a fully loaded tandem axle dump truck or similar prieumatic-dre equipment to locate are:j; luo5e subgrade.. In areas to be cut, the proofroll should be Performed after the final grade is established. In areas to be filled, the proofroll should be perfornned prior to placement of engineered fill and after the pavement subgrade is established- Areas of loose -or s. subgrad:e encountered in the proolrall should be removed and replaced with engineered fill, of moisture r-o n ditioried (dried or wetted. as needed) and compacted in Place. The clay soils are plastic and can undergo some volume change when subjected ta, moisture variations, If the moisture contents of these up I P ripper sails reduce, they may shrink. and Cracks may develop- If the rnoisture content of these materials increase, they could swell and lose strength, Shrinkage, swelling, or strength lo5s could be detrimental to the proper function of the pavement. VTQ Hu. 09-15503 P;19Q 5 AM concrete, trees, stumps, brush, abandoned structurea, roots, vegetation, rubbish and any other undesirable matter should be removed and disposed of properly, All vegetation should be removed and ft exposed surface should be scarified to an additional depth of at least 5 inches. It is the intent of these recommendations to provide a loose surface with no features that would tend to prevent uniform compaction by the equipment to be used. All areas to be filled should be d isced or bladed until u n ifo rm and free from large c lods, b rO Ug ht to a moisture content between oplimum and 4 per points above the optimum moisture value, and cornpacled to between 95 and 1.00 percent of optimum density in, accordance with ASTM D698. Fill Materials Materials to be used for general site frill should consist of on-site material approved by the Soils Engineer. Imported general site fill should have a liquid limit less than 60 and should be approved by the Soils Engineer. There should be no roots, vegetation or any other undesirable matter in the soil, and no rocks 1;3rgur than 4 inches in diameter. The fill material should be placed in level., uni I aryers. vwh ich, when Compacted, :sh Oki Id have a moisture content and density conforming to the stipulations called for herein.. Each layer should be thoroughly mixed during spreading to provide uniformity of the layer The fill thickness should not exceed 10-inch loose lifts. Prior to and in conjunction with the compacting operation, each layer should be brought to the proper moisture content as determined byAST10' 0698. We recommend the clay soils be moisture conditi on ed to a moisture content that is between optimum a n d 4 percentage p o ints above opbmum. After each layer has been properly placed, mixed acid spread, it should be thoroughly compacted to between 95 and 100 percent of Standard Proctor Density as determined by ASTNI D698. Density Tests Field Density tests shOUld boa made by the Soils Engineer or his representative. Density tests should be taken in eooh [avei of IN.- compacted material below ire disturbed surface, If the materials fait to I rneet the density spin. tied, the course should be rV - -. w, - ked as necessary to obtain the specified compaction. ProjW No, 09-15003 Page r,