Loading...
WA9903-CS000111SHIMEK, JACOBS & FINKLEA, L.L.P. CONSULTING ENGINEERS 8333 Douglas Avenue, #820 Dallas, Texas 75225-5816 Fax (214) 361-0204 ROSS L. JACOBS, P.E. RONALD V. CONWAY, P.E. JOHN W. BIRKHOFF, P.E. JOE R. CARTER, P.E. GARY C. HENDRICKS, P.E. I. C. FINKLEA, P.E. PAUL A. CARLiNE, P.E. MATT HICKEY, P.E. January 11, 2000 q o3 Phone (214) 361-7900 Mr. Kenneth M. Griffin, P.E. City of Coppell Post Office Box 478 Coppell, Texas 75019 Re: Addition of Pump Number 4 -Village Parkway Pump Station Cash Flow Projection Dear Mr. Griffin: As requested in the pre-construction conference for the Addition of Pump Number 4 to the Village Parkway Pump Station, Architectural Utilities Inc. has forwarded copies of their projected cash flow and itemized schedule of values for the project. We are forwarding these submittals for your files. 'Gary C. He ~ Enclosures ~ j:\clerical\coppell\1999-153\letters\constXk\cash flow.doe MONTHLY ESTIMATE PAGE I OWNER: CITY OF COPPELL 255 PARKWAY BOULEVARD COPPELL, TX 75019 CONTRACTOR: AUI JOB # 98048 ARCHITECTURAL UTILITIES, INC. dba AUI GENERAL CONTRACTORS P. O. BOX 11586 FORT WORTH, TX 76110 PROJECT: ADDITION OF PUMP 4 AT VILLAGE PARKWAY PUMP STATION ORIGINAL CONTRACT SUM: $ 346,000.00 PERIODICAL ESTIMATE NO.: I PERIOD ITEM DESCRIPTION SCHEDULED WORK OF VALUE WORK PREVIOUS PERIOD COMPLETED MATERIALS TOTAL STORED COMPLETE THIS ON SITE & STORED PERIOD TO DATE % COMPL BALANCE TO FINISH RETAINAGE 10% I Install Suction Piping $36,000.00 $0.00 2 30" Butterfly Valve $10,000.00 $0.00 3 Discharge Piping $31,000.00 $0.00 4 20" Check Valve $17,000.00 $0.00 5 20" Butterfly Valve $8,000.00 $0.00 6 3-24" Butterfly Valves $2.2,000.00 $0.00 7 Pipe Supperls $4,000.00 $0.00 8 Pump Base $4,800.00 $0.00 9 Pump $79,000.00 $0.00 10 Flow Tube &Piping $17,000.00 $0.00 11 Electrical $80,000.00 $0.00 12 I & C Sales $33,800.00 $0.00 13 Painting $3,400.00 $0.00 CHANGE ORDERS 14 CO#1 Additional Pump Charge TOTAL $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $o.00 $0.00 $0.00 $0.00 $0.0o $0.00 $0.00 $10,684.00 $0.00 $0.00 $0.00 $0.00 $356,684.00 $0.00 $0.00 $0.00 $0.00 0% $36,000.00 0% $10,000.00 0% $31,000.00 0% $17,000.00 0% $8,000.00 0% $22,000.00 0% $4,000.00 0% $4,800.00 0% $79,000.a0 0% $17,000.00 0% $80,000.00 0% $33,800.00 0% $3,400.00 0% $10,684.00 0% $356,684.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 ORIGINAL CONTRACT SUM NET CHANGE BY CHANGE ORDER CONTRACT SUM TO DATE TOTAL COMPLETED & STORED TO DATE RETAINAGE a. 10% of Completed Work b. 10% of Stored Material TOTAL RETAINAGE TOTAL EARNED LESS PREVIOUS CERTIFICATES OF PAYMENT CURRENT PAYMENT DUE BALANCE TO FINISH, PLUS RETAINAGE $0.00 $0.00 $346,000.00 $10,684.00 $356,684.00 $0.00 $0.00 $0.00 $0.00 $0.00 $356.684.00