Loading...
Sales Tax 09-LR110304GEOTECHNICML GROUr Acct ID: 1770 Report Date: 03/04/2011 Project: Clear Creek Location: Clear Creek Lane Consulting Engineering * Geotechnical Engineering * Construction Materials 3228 Halifax Street, Suite A, Dallas, Texas 75247 Phone: (972) 444 -8889 Fax: (972) 444 -8893 File No: C10 -1014 Date Sampled: 03/02/2011 Sampled By: Hanks, Marvin By Order Of: Rick O'dell Order Number: 1770 Client: City of Coppell REPORT: Lime Depth Verification LAB NO: 98114 -1 T est Me See B elow TEST RESULTS Report No: 98114 -1 Page 1 of 1 A field representative for Alliance Geotechnical Group, checked the depth of lime treatment of the subgrade after compaction. Depth measurements were performed using a phenolphthalein indicatior to verify compliance with project specifications that require a minimum 6 in. compacted thickness. The test results follow. Sample' Depth, No. L ocation in. 1 49 Clear Cre Lane 6.7 2 !4 70 Clear Cree Lane - -- - 7.00 — ' 3 450 Clear Creek Lane 6.75 Ong: City of Coppell (Coppell, TX) Attn: Mr. Keith Marvin, P. E. (1 -cc copy) 1 -cc City of Coppell Attn: Mr. Rick O'Dell Respectfully Submitted, Alliance Geotechnical Group Perry C. Kakara, Sr. Project Manager THIS REPORT APPLIES ONLY TO THE STANDARDS OR PROCEDURES INDICATED AND TO THE SAMPLE(S) TESTED AND /OR OBSERVED AND ARE NOT NECESSARILY INDICATIVE OF THE QUALITIES OF APPARENTLY IDENTICAL OR SIMILAR PRODUCTS OR PROCEDURES, NOR DO THEY REPRESENT AN ONGOING QUALITY ASSURANCE PROGRAM UNLESS SO NOTED, THESE REPORTS ARE FOR THE EXCLUSIVE USE OF THE ADDRESSED CLIENT AND ARE NOT TO BE REPRODUCED WITHOUT WRITTEN PERMISSION.