Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Cotton Belt-EM100212
Cotton Belt Corridor Conceptual Engineering & Funding Study Capital Cost Estimate Summary Rail Capital Cost in millions (2009 Dollars) Cost Category Alternative 1 Alternative 2 Alternative 3 Alternative 4 Alternative 5 Alternative 6 Guideway $122 $125 $215 $122 $135 $134 Stations $40 $44 $76 $40 $36 $40 Yard & Shop $3 $3 $3 $3 $3 $3 Sitework & Special Conditions $9 $10 $17 $9 $9 $43 Systems $47 $50 $74 $47 $45 $46 Allowances $190 $199 $330 $190 $197 $229 Right -of -Way $11 $12 $20 $11 $11 $14 Vehicles $103 $120 $173 $103 $103 $103 Unallocated Contingency $50 $50 $50 $50 $50 $50 Total Cost $575 $613 $958 $575 $590 $662 February 2010 Review Copy