Loading...
ST8805-CS 890425 Jerry Parci Consulting Engineers April 25, 1989 He. Vonita White Acting Superintendent Coppell Independent School District 1201 Wrangler Drive Coppe11, Texas 75019 214/471-1111 JP No. 88023; Construction Review; Parkway Boulavard~and High School Access Road; Coppell, Texas Dear Ms. White: On Friday, April 21, 1989, I visited the site to review utility construction currently underway by L. H. Lacy Company. This date was the twelveth day following start of construction. From a visual review and discussions with the city inspector and contractor, sanitary sewer construction to be provided under this contract is approximately 80% complete. Newly 'constructed manholes were evident. A contractor's representative et the site indicated that a sanitary sewer service line extending north under Parkway Boulevard from a manhole near Paving Station 59+23 had not yet been constructed. At the time of my visit, the contractor was preparing to proceed with construction of proposed water line improvements. The 8- inch water line constructed by the High School contractor to the east property of the high school had been uncovered. The water main to be constructed under this contract will ~onnect to the existing main in Denton Tap Road and provide a primary source of water to the High School. Water line fittings and pipe to be Installed under this contract were evident on the site. Another important step in providing water to the High School was underway during my visit. The city's contractor reported that construction of the water line bore under Denton Tap Road was nearing completion. Since the existing water main in Denton Tap Road is on the east side of the Right-of-Way, this bore is necessary to provide a water main to the west side of Denton Tap which can be extended west in Parkway Boulevard toward the new High School. The bore is being provided through an escrow agreement previously executed between the City and ABQ Development Corporation. 320 Westway Place, Suite 501 · Arlington, Texas 76018 · Metro ~817) 467-2418 · (8171 465:0259 Vonita White No. 88023 Page 2 of 2 In general, L. H. Lacy seems to be making excellent progress and is approaching the project with the goal of getting the access to the High School from Denton Tap Road in operation as soon as possible. The City of Coppell has recently approved a change order to add the construction of' the Parkway Boulevard West turnout from Denton Tap Road to the Denton Tap Road Improvement Pro~ect. This latter project is also being constructed by L. H. Lacy CompanY. The turnout primarily consists of the roadway surface from the westerly curb of Denton Tap Road to the west end of the curves in the street curbs leading around to Parkway Boulevard West. This turnout will link roadway construction performed under YoUr contract to Denton Tap Road. L. H. Lacy has received our request to add a two-inch meter setter on the irrigation service line in Parkway Boulevard. They have provided me a cost of $410.00 to install this equipment. L. H. Lacy has also received our request to add 2 - 2-inch P.V.C. pipes under Parkway Boulevard at Paving Station 57+00. Each of these pipes will be 85 feet long for a total addition of 170 feet of two-inch P.V.C. conduit. Unit price is $2.00/linear foot. Total cost for additional 2-inch pipe is $340.00. ! have authorized L. H. Lacy to proceed with construction of both the meter setter and the, additional two-inch conduit. These facilities were required by the City after the plans were sent out for bid. Water main construction should be completed week depending on weather. This will be drainage construction. Hopefully paving begin by the middle of Hay, 1989. by the end of next followed by storm construction should If you have any questions, please call. Sincerely dP:ch CC: Hr. day Chester, P.E./ABQ Development Corporation Hr. Skip Clements/L. H. Lacy Construction Hr. Howard Pafford/City of Coppell ........ ]___- - /City of Coppel.1