Loading...
ST0701-CS100722 T H E C 1 T Y O F COPPELL 9 A S 1 a July 22, 2010 Kody Harris Lacy Construction kharris@lhlacy.com RE: Project #ST 07 -01 Southwestern Blvd. Final Walk- through Inspection Rescheduled Dear Mr. Harris: Please be advised that a walk - through is scheduled for Thursday, July 29, 2010 at 8:00 a.m. for the water, sanitary sewer, paving and drainage facilities in the referenced project. Please ensure that all facilities are clean and accessible at that time and that contractor's representatives are present to assist with the inspection. Your cooperation in this effort is greatly appreciated. If you have any questions, please call 972 - 304 -7090 at your earliest convenience. Sincerely, PA4,046,y, Rick O'Dell Construction Inspector Office Phone: (972) 304 -7090 Fax: (972) 304 -3570 cc: Ken Griffin, P.E., Dir. of Engineering & Public Works Streets Dept. Utilities Dept. Tim Oates, Deputy Chief /Prevention Jorge Rodriquez, Halff Associates Matt Oyen, PacTrust 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673