Loading...
ST0301A-CS110323 T H E C 1 T Y O F COPPELL h 8 I S March 23, 2011 Marty Murphy JRJ Paving LP 1805 Royal Lane, Suite 107 Dallas TX 75229 RE: Bethel Rd. (Denton Tap to Penfolds Ln), Project #ST 03 -01 A Final Acceptance Dear Mr. Murphy: Representatives of the City of Coppell have confirmed a final inspection of improvements for the referenced project. The record drawings have been received from the design engineering firm. The expiration date for the Maintenance Bond will be February 1, 2013. The letter of substantial compliance from Texas Department of Licensing & Regulation has been received with no deficiencies noted during the inspection. A follow -up inspection of the facilities will be conducted prior to the lapse of the two - year maintenance period. If any punchlist items are noted at that time, you will be contacted to make repairs. Thanks for your cooperation during the course of the project. Sincerel y Davis Keith R. Marvin, P.E. ' , ,nstruction I spector Project Engineer • ffice Phone: ' 72) 304 -3684 Fax: (972) 304 -3570 cc: Ken Griffin, P.E., Director of Engineering & Public Works Glenn Hollowell, P.E., Asst. Director of Public Works Caleb Thornhill, P.E., Freese & Nichols, Inc. A FAMILY COMMUNITY FOR A LIFETIME 255 PARKWAY * PO. BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * WWW.COPPELLTX.GOV