Loading...
MA1001-LR100706 — Consulting Engineering * Geotechnical Engineering * Construction Materials f9LLIAPICE 3228 Halifax Street, Suite A, Dallas, Texas 75247 GEOTECHPIICRL Phone: (972) 444 -8889 Fax: (972) 444 -8893 GROUP Acct ID: 1770 File No: C10 -0535 Date Sampled: 06/28/2010 Report Date: 07/06/2010 Previously Reported: 06/29/2010 Sampled By: Wingerd, Pierce Project: Denton Tap & Sandy Lake Brick Paver Replacement C.I.P Project By Order Of: Rick O'Dell MA 10 -01 Location: Stamped Concrete Westside of Intersection on Shady Lake, NW Order Number: Vendor #9176 conrer Number of Client: The City of Coppell Specimens: 4 REPORT: REPORT OF CONCRETE COMPRESSIVE STRENGTH TEST LAB NO: 86889 Material: CONCRETE Test Method: See Below TEST RESULTS Report No: 86889 Page 1 of 1 Maximum Compressive Average Spec Age Tested Diameter Area Load Cure Strength Strength Nbr (days) (in) (in') (Ibs) Break Type Loc (PSI) (PSI) Comments A 1 6.00 28.27 75,230 Type 4 Lab 2,660 2,660 B 3 6.00 28.27 89,100 Type 4 Lab 3,150 3,150 C 7 6.00 28.27 120,530 Type 4 Lab 4,260 4,260 D 28 6.00 28.27 La l ni Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 Specification: 4,000 psi @ 28 days Date Received: 06/29/2010 Slump: 4.0 Inches Transported By: Southern Star Curing Method: Standard Air Content: 5.6% Source /Sampled At: Truck / Center Time Sampled: 8:35 am Plant: #125 Temp.: Ambient: 85 °F Mix: 92 °F Mix Code: 9363 Truck/Ticket No: 2040 / 1682272 Quantity Represented: 5 cu. yds. at 10 cu. yds. placed of a 40 cu. yd. total placement Remarks: Test Method (As Applicable): Unless noted, concrete was sampled and tested in accordance with ATM C172, C143, C231 or C173, C1064 and C138. Compressive strength tests per ASTM C39. Charge: The City of Coppell Attn: George S. Marshall, P.E. Orig: The City of Coppell (Coppell, TX) Attn: George S. Marshall, P.E. Respectfully Submitted, (1- ec copy) Alliance Geotechnical Group 1 -ec Jim Bowman Construction Company, L.P Attn: Lee Halencak, P.E. 1 -ec The City of Coppell Attn: Rick O'Dell air • Robert P. Nance, Sr. Project Manager THIS REPORT APPLIES ONLY TO THE STANDARDS OR PROCEDURES INDICATED AND TO THE SAMPLE(S) TESTED AND /OR OBSERVED AND ARE NOT NECESSARILY INDICATIVE OF THE QUALITIES OF APPARENTLY IDENTICAL OR SIMILAR PRODUCTS OR PROCEDURES, NOR DO THEY REPRESENT AN ONGOING QUALITY ASSURANCE PROGRAM UNLESS SO NOTED. THESE REPORTS ARE FOR THE EXCLUSIVE USE OF THE ADDRESSED CLIENT AND ARE NOT TO BE REPRODUCED WITHOUT WRITTEN PERMISSION. Consulting Engineering *Geotechnical Engineering * Construction Materials ALLIAnCE 3228 Halifax Street, Suite A, Dallas, Texas 75247 GEOTECHPIICAL Phone: (972) 444 -8889 Fax: (972) 444 -8893 GROUP Acct ID: 1770 File No: C10 -0535 Date Sampled: 06/26/2010 Report Date: 07/06/2010 Sampled By: Gatton, Tim Project: Denton Tap & Sandy Lake Brick Paver Replacement C.I.P Project By Order Of: Rick O'DeII MA 10 -01 Location: Sidewalk on Eastbound Sandy Lake - 2' East x 3' South of Order Number: Vendor #9176 Yellow Fire Hydrant Number of Client: The City of Coppell Specimens: 4 REPORT: REPORT OF CONCRETE COMPRESSIVE STRENGTH TEST LAB NO: 86882 Material: CONCRETE Test Method: See Below TEST RESULTS Report No: 86882 Page 1 of 1 Maximum Compressive Average Spec Age Tested Diameter Area Load Cure Strength Strength Nbr (days) (in) (in (Ibs) Break Type Loc (PSI) (PSI) Comments A 7 6.00 28.27 42,660 Type 3 Lab 1,510 1,510 B 14 6.00 28.27 Lab C 28 6.00 28.27 Lab D HOLD (see remarks) - R( Type 1 Type 2 Type 3 Type 4 Type 5 Type 6 Specification: 3,000 psi @ 28 days Date Received: 06/27/2010 Slump: 4.0 Inches Transported By: LMC Curing Method: Standard Air Content: 4.5% Source /Sampled At: Truck / Center Time Sampled: 10:15 am Plant: #6 Temp.: Ambient: 89 °F Mix: 92 °F Mix Code: 1261 Truck/Ticket No: 1091 / 6372967 Quantity Represented: 5 cu. yds. at 10 cu. yds. placed of a 10 cu. yd. total placement Remarks: Test Method (As Applicable): Unless noted, concrete was sampled and tested in accordance with ATM C172, C143, C231 or C173, C1064 and C138. Compressive strength tests per ASTM C39. Charge: The City of Coppell Attn: George S. Marshall, P.E. Orig: The City of Coppell (Coppell, TX) Attn: George S. Marshall, P.E. Respectfully Submitted, (1- ec copy) Alliance Geotechnical Group 1 -ec Jim Bowman Construction Company, L.P Attn: Lee Halencak, P.E. 1 -ec The City of Coppell Attn: Rick O'Dell Robert P. Nance, Sr. Project Manager THIS REPORT APPLIES ONLY TO THE STANDARDS OR PROCEDURES INDICATED AND TO THE SAMPLE(S) TESTED AND /OR OBSERVED AND ARE NOT NECESSARILY INDICATIVE OF THE QUALITIES OF APPARENTLY IDENTICAL OR SIMILAR PRODUCTS OR PROCEDURES, NOR DO THEY REPRESENT AN ONGOING QUALITY ASSURANCE PROGRAM UNLESS SO NOTED. THESE REPORTS ARE FOR THE EXCLUSIVE USE OF THE ADDRESSED CLIENT AND ARE NOT TO BE REPRODUCED WITHOUT WRITTEN PERMISSION.