Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Barnes-CS110322 (2)
(8/16/2011) Rhonda Adloo - FYI - Re: Sidewalks for Barnes @ RiverviewPage 1 From: Rhonda Adloo To:Michael Garza; Richard Odell Date: 3/23/2011 8:19 AM Subject: FYI - Re: Sidewalks for Barnes @ Riverview Daniel St. Claire's response... Rhonda, Thanks for your help. The side walks and the ADA corner ramp along Sandy Lake were installed when Sandy Lake was widen several years ago. The only city side walks we added were along Riverview. We'll talk to Metroplex about adding that to the M-bond quantities. Dan Quantum -------------------------------------------------------------------------------- From: Rhonda Adloo <radloo@coppelltx.gov> To: Qhomes@att.net Cc: jeff@mpxco.com Sent: Tue, March 22, 2011 1:52:05 PM Subject: Sidewalks for Barnes @ Riverview Daniel, Rick mentioned to me that there is no accounting for the value of the sidewalks built for this project on the quantities Metro-Plex sent over to go with the M-bond. He said sidewalk was constructed on Riverview and in front of the buildings on Sandy Lake, as well as ADA ramps on the corner. That is the only issue remaining to his knowledge. Rhonda Adloo Page 1 of 1 Rhonda Adloo - Barnes at Riverview From: "Jeff Hall" <jeff@mpxco.com> To: "Rhonda Adloo" <radloo@coppelltx.gov> Date: 3/22/2011 2:43 PM Subject: Barnes at Riverview Rhonda, I spoke with the owner of Metro-Plex Paving and Underground, and he said we poured no sidewalk or ADA ramps on this job. Not sure what Rick is talking about, check with the builder, Kevin Kendrick? If there was sidewalk repair out front, we didn't make it. Thanks, Jeff Hall Estimator Metro-Plex Underground jeff@mpxco.com P.O. Box 129 Lewisville,TX 75067 tel: 972-221-4561 fax: 972-420-0267 mobile: 214-796-8013 file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4D88B597City_...3/31/2011 (3/22/2011) Rhonda Adloo - Daniel St. Claire - re: Barnes @ Riverview maintenance bond Page 1 From: Rhonda Adloo To: Qhomes©att.net Date: 3/22/2011 8:06 AM Subject: Daniel St. Claire - re: Barnes © Riverview maintenance bond Daniel, the m -bond that Metro -plex Underground submitted did not have a quantities list attached. I cannot tell what is covered by just looking at the amount listed on the bond. If you can make sure we receive the quantities breakdown & all paving is listed, it should not take long to get the Engineering signature on the CO. Call me if you have any questions. Rhonda Adloo Engineering Department / Administrative Technician 972/304 -3682 radloo @coppelltx.gov Consider the environment before printing this email. the zx /, �/ 7/zr