Loading...
SW0801-CS110331 Mar.31.2011 09:55 AM Public Works 9724625199 PAVE„ 1 / 1 MEMORANDUM FROM THE DEPARTMENT OF PUBLIC WORKS To: Larry Davis, Construction Inspector Engineering From: Frank Garza, Streets Department Date: March 31, 2011 RE: Watk -thru' Sidewalk Project East Side Denton Tap 1. Need to seal joint at Texaco on Beltline entrance. Marked with green paint. 2. Need to rout & seal approaches that are marked with paint. Locations: Entrance at Shell Store; Braewood Shopping Center north entrance; Local Diner entrance; Chipotle entrance. 3. Operate irrigation 4. Replace landscape damaged at 598 Denton Tap. 5. A maintenance bond will be required when the entire project is complete. 6. A certification letter will be needed when the entire project is complete. Arad 7 /4°'? 43// ,T;' CITY Oh (OPPELL PUBLIC WORKS DEPARTMENT