Loading...
ST0003-CS110401 T H E G 1 T Y O F COPPELL , April 1, 2011 Robert Caudill Tiseo Paving Company PO Box 270040 Dallas TX 75227 RE: Coppell Road, Project #ST 00 -03 Final Acceptance Dear Mr. Caudill: We found in reviewing our files that we may have inadvertently failed to send your company a letter of final acceptance for the above referenced project. We are basing the date of final acceptance on the date the final pay application was accepted and signed, which was July 29, 2009. Based on that date, the maintenance bond provided in your contract will expire on July 29, 2011. A follow -up inspection of the facilities will be conducted prior to the lapse of the two -year bond period. If any punchlist items are noted at that time, you will be contacted to make repairs. Thanks for your cooperation in this effort. Sincerely, Keith R. Marvin, P.E. Project Engineer Office Phone: (972) 304 -3681 Fax: (972) 304 -3570 cc: Ken Griffin, P.E., Director of Engineering & Public Works Glenn Hollowell, P.E., Asst. Director of Public Works Albert Samaniego, Construction Inspector A FAMILY COMMUNLT' f P A LIIk TIME 255 PARKWAY * P.O. BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * WWW.COPPELLTX. GOV