Loading...
Carter Addn 3-CS110406 DOWDEY, ANDERSON r & ASSOCIATES INC CIVIL ENGINEERS 5225 Village Creek Drive Suite 200 Plano, Texas 75093 972. 931 -0694 972-931-9538 fax April6, 2011 Mr. Michael Garza City of Coppell Engineering Department 255 Parkway Blvd. Coppell, TX 75019 Re: Carter Addition Phase III DAA Job #07111C Dear Mr. Garza, We are resubmitting the construction documents for Carter Addition Phase three. Below is a list of explanations to your comments from the letter dated 03/15/2011. General 1. The HOA lot (Lot 2X) and the mutual access easement have been added to the Plat. Paving Plan 2. Design criteria for vertical curves are met according to the City of Coppell subdivision ordinance. 3. Barrier free ramps are shown on the plans as specified and crosswalks are at a minimum of 2% cross slope. 4. Elevations have been provided for the North and South elbows (see Plate 3). 5. The gas line has been potholed and is shown in the profile of each street /alley crossing. 6. Due to the speed at which vehicles will be traveling around the elbow, the sight visibility and SSD is adequate. Drainage Plan 7. Offsite drainage from existing Northlake Woodlands has been accounted for. 8. Both storm sewer networks have been extended to the creek. The existing ground topo has been updated and is reflected on the plans. 9. There is a retaining wall along a portion of Legacy Drive (see Plate 12) 10. The gas line has been potholed and is shown in the profile of each storm sewer crossing. 11. Profiles of the extended storm sewer networks are provided and the two headwalls have pier details per your request. Water Plan 12. The comments on the Water & Sanitary Sewer plan and profiles have been addressed. R:\ Data\ 2007\07111 \00 \Correspondence\Letters \08060 -Ltr- Coppell -Gana- 2011- 04 -06- Response Letter.docx Sanitary Sewer Plan/Profile 13. The sanitary sewer network now reflects your request and ties directly into the existing manhole. Grading Plan 14. A guard rail detail have been provided. The guard rail is clearly labeled in the paving plan and grading plan. Retaining wall plans and specifications shall be provided by the retaining wall contractor. 15. Due to the speed at which vehicles will be traveling around the elbow, the sight visibility and SSD are adequate. 16. The HOA lot next to Alley A is now shown. Please call should you have any further questions or comments. Very Sincerely, 442111611 J. Casey R ss, P.E. Dowdey, Anderson and Associates, Inc. 5225 Village Creek Drive, Suite 200 Plano, TX 75052 972 -931 -0694 Fax: 972-931-9538 R:\ Data\ 20 07 \07111 \00 \Correspondence\Letters \08060- Ltr- Coppell- Garza- 2011- 04 -06- Response Letter.docx DOWDEY, ON A & ASSOCIATES I NC. CIVIL ENGINEERS 5225 Village Creek Drive, Suite 200 Plano, Texas 75093 Phone 972.931.0694 Fax 972.931.9538 TRANSMI1TAL To: Engineering Department From: Colin Helffrich for J. Casey Ross, P.E. Co: City of Coppell Date: 06 April 2011 Address: 255 Parkway Boulevard CC: File Coppell, TX 75019 Phone: 972 - 304 -3678 Via: Courier Re: Carter Addition Phase III Job #: 07111 C Construction Plans, 2` Submittal Please find attached the following items that pertain to the construction plan submittal for the above - referenced project: • 2 — 24 x 36 sets of REVISED construction plans • 1 — 24 x 36 set of marked -up construction plans • 1 — Response Letter Thank you, Colin Helffrich L. 4 / 7 R: \Data\2007\ 07111 \00\ Correspondence\Transmittals \07111 C- Trans- Coppell- 2011 -04 -06 -CP 2nd submittal.docx