Arbor Manors 4R-CS110412
MEMORANDUM
FROM THE
DEPARTMENT OF PUBLIC WORKS
To: Albert Samaniego, Construction Inspector Engineering
From: Frank Garza, Street Department
Date: April 12, 2011
RE: Final Walk –Thru for Dr. Elliot Eye Care Center
1. Replace panel where new sidewalk meets old sidewalk next to Denton Tap, marked
with green paint.
2. Need to strip wood down at joints and seal, marked with paint.
3. Need to seal joints around approach entrance, marked with paint.
4. Need to replace ramps with brick pavers.
5. Need to rout and seal cracks at approach next to ramps, marked with paint.
CITY OF COPPELL PUBLIC WORKS DEPARTMENT
Apr.12.2011 10:08 AM Public Works 9724625199 PAGE. 1/ 1
T H C• C I T Y • 0 F
CQPFEI.L
. N '..�. ~
MEMORANDUM
TO: Albert Samaniego, Engineering
FROM: David Stone, Public Works
DATE: April 12, 2011
REF: Elliott Eye Care, W. Braewood Denton Tap Rd
1. Paint all lids blue for meter cans
•
2. Redo irrigation from flange to D/C
3, Mark "WD" for domestic meter
4. Pain fire hydrant yellow
5. Put blue reflector in parking lot in front of fire hydrant
6. Both manholes need stainless steel rainpans
7. Paint manhole lids red
8. Paint "M:H" in red on curb
Call 972 - 462 -5150 to schedule Public Works to check punch list upon completion.
•