ST0502-CS070928 \ ti
TRANSPORT4TION IM I PROVEMENT PROGRAM MODIFICATION
Subregion: EASTERN 7 C. / /2 6/07
Program(s): ❑ CMAQ C' STP -MM ❑ Transit k Other 10 MISCELLANEOUS (DFW RTR FUNDS)
Type of Modification: ❑ Administrative 19 Current RTC Action ❑ Previous RTC Action
Modification Number: 2008 -044 STIP Revision Required ?: YES
NCTCOG Project Code(s): 11532
NCTCOG TIP Page Number(s): F.16 MTP Reference(s): TH2 1815
TXDOT Control Section Job Number(s): 0918 -47 -983
Original Project Scope and COPPELL — FREEPORT PKWY FROM SH 121 TO SANDY LAKE; CONSTRUCT NEW 6 -LANE
Location: FACILITY; NEW ROADWAY
,271 I�1
Original Funded Amount: FYO9— $4,550,000 TOTAL ($3,640,000 FEDERAL AND $910,000 LOCAL)
Estimated Construction Cost: N/A Percent: N/A
Construction Bid Price: N/A Percent: N/A
Request: CHANGE FUNDING SOURCE FROM STP -MM TO 10 MISCELLANEOUS (DFW RTR FUNDS)
Financial Constraint Statement:
DOES NOT VIOLATE FINANCIAL CONSTRAINT AS SUFFICIENT APPORTIONMENT AVAILABLE TO PROGRAM THE
REQUESTED FUNDING AMOUNT
Air Quality Conformity Statement:
THIS PROJECT IS CONSISTENT WITH MOBILITY 2030 AND THE RESULTING AIR QUALITY CONFORMITY ANALYSIS
Other:
J Contingent on TxDOT approval? YES
Certified by:
Michael Morris, P.E. Date
Director of Transportation
NCTCOG
The following signature authorizes:
n additional Metropolitan Planning Organization (MPO) allocated funds to be moved into Year One.
❑ modification to a project funded through a TxDOT - selected program.
Certified by:
William Hale, P.E. Date
District Engineer
TXDOT, Dallas District
ct/
50
'T S — �2
TRANSPORTATION IMPROVEMENT PROGRAM MODIFICATION
Subregion: EASTERN (' 31 D7
Program(s): ❑ CMAQ C STP -MM ❑ Transit N Other 10 MISCELLANEOUS (DFW RTR FUNDS)
Type of Modification: ❑ Administrative in Current RTC Action n Previous RTC Action
Modification Number: 2008 -045 STIP Revision Required ?: YES
NCTCOG Project Code(s): 11533
NCTCOG TIP Page Number(s): F.16 MTP Reference(s): TH2 1810
TXDOT Control Section Job Number(s): 0918 -47 -984
Original Project Scope and COPPELL — FREEPORT PKWY FROM SANDY LAKE RD TO RUBY RD; WIDEN 2 TO 4 LANES
Location:
Original Funded Amount: FY09 -- $4,210,000 TOTAL ($3,368,000 FEDERAL AND $842,000 LOCAL)
Estimated Construction Cost: N/A Percent: N/A
Construction Bid Price: N/A Percent: N/A
Request: CHANGE FUNDING SOURCE FROM STP -MM TO 10- MISCELLANEOUS (DFW RTR FUNDS)
Financial Constraint Statement:
DOES NOT VIOLATE FINANCIAL CONSTRAINT AS SUFFICIENT APPORTIONMENT AVAILABLE TO PROGRAM THE
REQUESTED FUNDING AMOUNT
Air Quality Conformity Statement:
THIS PROJECT IS CONSISTENT WITH MOBILITY 2030 AND THE RESULTING AIR QUALITY CONFORMITY ANALYSIS
Other:
1.4 Contingent on TxDOT approval? YES
Certified by:
Michael Morris, P.E. Date
Director of Transportation
NCTCOG
The following signature authorizes:
[i additional Metropolitan Planning Organization (MPO) allocated funds to be moved into Year One.
❑ modification to a project funded through a TxDOT - selected program.
Certified by:
William Hale, P.E. Date
District Engineer
TXDOT, Dallas District
51
,.... ) "'"'""•,..„_) \
J .\---j--Ijr'f::::'IL— \
• \ M
9
) � rr \
Ill t S
ti ' \ \ ` \` ``
■
` \
•
11 .. (-_. f •
jil �,
.. '� ✓,�:
•
• --n:`- ' =_ \— �; . ,
} _tee �i
r / f} ± /
h. - / - -T� ', ` � i
2i ' , \ \ ill
04425F-"40 4 i
N \
D r ) �JC' \ J ..--)
0 •
l
C -C) ar4avovy,_ ` 7 -
�tYom; / �Y, J'
L
v
9
t 0 c) >
/d. • D u n
r —
G
.00 Z
Se m D
r
-
M
. / O
r r)
N m
Z �
y -4 0
.• -1
fl
rn 1 Ni 'T.) / 1
- T] 1
°_ D m
_,rn rn
r., r`r
I
l rn
I 4 -