Loading...
ST0502-CS070928 \ ti TRANSPORT4TION IM I PROVEMENT PROGRAM MODIFICATION Subregion: EASTERN 7 C. / /2 6/07 Program(s): ❑ CMAQ C' STP -MM ❑ Transit k Other 10 MISCELLANEOUS (DFW RTR FUNDS) Type of Modification: ❑ Administrative 19 Current RTC Action ❑ Previous RTC Action Modification Number: 2008 -044 STIP Revision Required ?: YES NCTCOG Project Code(s): 11532 NCTCOG TIP Page Number(s): F.16 MTP Reference(s): TH2 1815 TXDOT Control Section Job Number(s): 0918 -47 -983 Original Project Scope and COPPELL — FREEPORT PKWY FROM SH 121 TO SANDY LAKE; CONSTRUCT NEW 6 -LANE Location: FACILITY; NEW ROADWAY ,271 I�1 Original Funded Amount: FYO9— $4,550,000 TOTAL ($3,640,000 FEDERAL AND $910,000 LOCAL) Estimated Construction Cost: N/A Percent: N/A Construction Bid Price: N/A Percent: N/A Request: CHANGE FUNDING SOURCE FROM STP -MM TO 10 MISCELLANEOUS (DFW RTR FUNDS) Financial Constraint Statement: DOES NOT VIOLATE FINANCIAL CONSTRAINT AS SUFFICIENT APPORTIONMENT AVAILABLE TO PROGRAM THE REQUESTED FUNDING AMOUNT Air Quality Conformity Statement: THIS PROJECT IS CONSISTENT WITH MOBILITY 2030 AND THE RESULTING AIR QUALITY CONFORMITY ANALYSIS Other: J Contingent on TxDOT approval? YES Certified by: Michael Morris, P.E. Date Director of Transportation NCTCOG The following signature authorizes: n additional Metropolitan Planning Organization (MPO) allocated funds to be moved into Year One. ❑ modification to a project funded through a TxDOT - selected program. Certified by: William Hale, P.E. Date District Engineer TXDOT, Dallas District ct/ 50 'T S — �2 TRANSPORTATION IMPROVEMENT PROGRAM MODIFICATION Subregion: EASTERN (' 31 D7 Program(s): ❑ CMAQ C STP -MM ❑ Transit N Other 10 MISCELLANEOUS (DFW RTR FUNDS) Type of Modification: ❑ Administrative in Current RTC Action n Previous RTC Action Modification Number: 2008 -045 STIP Revision Required ?: YES NCTCOG Project Code(s): 11533 NCTCOG TIP Page Number(s): F.16 MTP Reference(s): TH2 1810 TXDOT Control Section Job Number(s): 0918 -47 -984 Original Project Scope and COPPELL — FREEPORT PKWY FROM SANDY LAKE RD TO RUBY RD; WIDEN 2 TO 4 LANES Location: Original Funded Amount: FY09 -- $4,210,000 TOTAL ($3,368,000 FEDERAL AND $842,000 LOCAL) Estimated Construction Cost: N/A Percent: N/A Construction Bid Price: N/A Percent: N/A Request: CHANGE FUNDING SOURCE FROM STP -MM TO 10- MISCELLANEOUS (DFW RTR FUNDS) Financial Constraint Statement: DOES NOT VIOLATE FINANCIAL CONSTRAINT AS SUFFICIENT APPORTIONMENT AVAILABLE TO PROGRAM THE REQUESTED FUNDING AMOUNT Air Quality Conformity Statement: THIS PROJECT IS CONSISTENT WITH MOBILITY 2030 AND THE RESULTING AIR QUALITY CONFORMITY ANALYSIS Other: 1.4 Contingent on TxDOT approval? YES Certified by: Michael Morris, P.E. Date Director of Transportation NCTCOG The following signature authorizes: [i additional Metropolitan Planning Organization (MPO) allocated funds to be moved into Year One. ❑ modification to a project funded through a TxDOT - selected program. Certified by: William Hale, P.E. Date District Engineer TXDOT, Dallas District 51 ,.... ) "'"'""•,..„_) \ J .\---j--Ijr'f::::'IL— \ • \ M 9 ) � rr \ Ill t S ti ' \ \ ` \` `` ■ ` \ • 11 .. (-_. f • jil �, .. '� ✓,�: • • --n:`- ' =_ \— �; . , } _tee �i r / f} ± / h. - / - -T� ', ` � i 2i ' , \ \ ill 04425F-"40 4 i N \ D r ) �JC' \ J ..--) 0 • l C -C) ar4avovy,_ ` 7 - �tYom; / �Y, J' L v 9 t 0 c) > /d. • D u n r — G .00 Z Se m D r - M . / O r r) N m Z � y -4 0 .• -1 fl rn 1 Ni 'T.) / 1 - T] 1 °_ D m _,rn rn r., r`r I l rn I 4 -