Loading...
ST0502-CS070730 Page 1 of 1 Rhonda Adloo - cost estimates Freeport Parkway (ST05 -02 A & B) From: Ken Griffin To: jperez @nctcog.org Date: 7/30/2007 2:51 PM Subject: cost estimates Freeport Parkway (ST05 -02 A & B) CC: Keith Marvin; Rhonda Adloo Jose Because we have not started the actual design, we do not have exact quantities and cost information. However, we have spoken to Freese and Nichols about designing the project and they provided a cost estimate in November 2005. Their estimate only covered construction, so I modified it today to include design, right of way acquisition and geotechnical. Freeport (SH 121 to Sandy Lake) Construction $5,271,171 Right of Way $2,150,000 Design $805,000 Geotechnical $143,750 Total $8,370421 Freeport (Sandy Lake to Ruby) Construction $4,133,660 Right of Way $258,750 Design $632,500 Geotechnical $115,000 Total $5,1 I hope this information is what you needed. If not please feel free to contact me at your convenience. Ken Griffin, P. E. Director of Engineering /Public Works 972 - 304 -3686 kgriffin @ci.coppell.tx.us file: / /C: \Documents and Settings \rbrother \Local Settings \Temp \XPgrpwise \46ADFAD5Cit... 8/31/2007