Loading...
PA9701-CS 961227The City With A Beautiful Future P.O. Box 478 Coppell, Texas 75019 214-462-0022 December 27, 1996 Buddy Echols, Superintendent Coppell ISD 200 S. Denton Tap Road Coppe!l, TX 75019 RE: Coppeil Middle School West parking lot Dear Mr. F.~7.bois: Attached is a cost estimate from Dallas County Road and Bridge Division for the proposed rejuvenated asphalt paving for the existing bus parking lot at the Coppell Middle School West. This estimate includes the additional rap material to stabilize the base of the parking lot and the cost to apply the surfacing material. Listed below are three issues that need to be addressed prior to Dallas County beginning work on the parking lot: 1) 2) 3) The proposed additional material to stabilize the bus parking lot will raise the parking lot approximately 6 inches. This could cause some drainage problems unless steps are taken to correct the drainage. I will be glad to walk the site with you to determine a solution. The temporary relocation of school buses and the work shed needs to be discussed. If the shed cannot be moved please let me know. Consideration needs to be given to the removal of the existing security fence and replacing it after the completion of the work on the parFAng lot. This was suggested by Mike Sharp, with Dallas County,' to ensure that the whole parking lot could be stabilized and paved. If this c~nnot be done please let me know. I will be glad to set up a meeting with Mike Sharp, Dallas County Supervisor Precinct No.l, to walk the site and discuss these issues. Please contact me at (972) 304-3681 if you have any questions or comments. Sincerely, Michael A. Martin, E.I.T. Assistant City Engineer CC: Jim Witt, City Manager Clay Phillips, Deputy City Manager ESTIMATE BUS PARKING LOT Wrangler Road City of Coppell Haul Cost and Placement of 1,419 Cubic Yards of RAP Labor and Equipment for Application of ARE 68 and Premo Materials (ARE 68 and Prcmo) 3,080.00 5,207.76 Total Estimated Cost $21,502.46 City Responsibilities: I ) City will be responsible for drainagc. City to check and insure that raising the elevation of the parking lot by 6 inches will not flood the school building. 2) City will clcar the parking lot of buses and work shed. 3) City to consider removing .security fencc m~d replacing it after completion of work on parking lot.