Loading...
PA9901-LR001026 CONCRETE COMPRESSIVE STRENGTH TES's FIE ENGINEERING, INC. a division of llerracon 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 09/20/2000 Report No.: 0024673 Report Date 10/26/2000 Client No.: 36503000 Project No.: 94001043 • Client: Hisaw & Associates Project: Wagon Wheel Park Attn: Bill Morgan 154 S. State Road 3116 Kellway Dr., Suite 116 Carrollton TX 75006 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw MIX I.D.: 9339 CONCRETE SUPPLIER: Pioneer PLACEMENT DATE: 09/20/2000 BATCH TIME: N/A PLANT: 27 TIME SAMPLED: 10:35am BY: Albert Garcia SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 88 F CONCRETE: 85 F SLUMP: 3 -5 TRUCK NO: 648 TICKET NO: 687494 AIR: 3 -6% AIR CONTENT ( %): N/A UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C -143 PLACEMENT LOCATION: ASTM C-172 Paving -See attached sketch ASTM C -39 NOTE: REVISED specification requirements for strength from 3500 psi to SAMPLE LOCATION: See attached sketch 3000 psi on 10/26/00. REPORT OF TESTS ACCUMULATIVE YARDS: 20 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 5.50 09/27/2000 7 78150 2760 1 2 5.50 09/27/2000 7 75310 2660 Average 2710 1 3 5.50 10/18/2000 28 101220 3580 1 4 5.50 10/18/2000 28 101770 3600 Average 3590 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0188 Page 1 of 2 CONCRETE COMPRESSIVE STRENGTH TES ENGINEERING, INC. a division of 'l l thacon 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 09/20/2000 Report No.: 0024673 Report Date 10/26/2000 Client No.: 36503000 Project No.: 94001043 Client: Hisaw & Associates Project: Wagon Wheel Park Attn: Bill Morgan 154 S. State Road 3116 Kellway Dr., Suite 116 Coppell, Texas Carrollton TX 75006 pp Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw MIX I.D.: 9339 CONCRETE SUPPLIER: Pioneer PLACEMENT DATE: 09/20/2000 BATCH TIME: 1:3Opm PLANT: 27 TIME SAMPLED: 2:OOpm BY: Albert Garcia SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 88 F CONCRETE: 87 F SLUMP: 3-5" TRUCK NO: 103 TICKET NO: 663994 AIR: 3 -6% AIR CONTENT ( %): N/A UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C -143 PLACEMENT LOCATION: ASTM C -172 See page 1. ASTM C -39 NOTE: REVISED specification requirements for strength from 3500 psi to 3000 psi on 10/26/00. SAMPLE LOCATION: See attached sketch REPORT OF TESTS ACCUMULATIVE YARDS: 120 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 1 6.00 09/27/2000 7 56150 1990 2 2 6.00 09/27/2000 7 62900 2220 Average 2110 2 3 6.00 10/18/2000 28 91080 3220 2 4 6.00 10/18/2000 28 90810 3210 Average 3220 Technician: Albert Garcia Started: 9:30am Finished: 3:OOpm „4 , 1 1/V Report Distribution: nglneering, Inc. (I) Hisaw & Associates (1) City of Coppell - Engineering Dept. Eric J. Cleveland, P.E. Senior Project Engineer This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01SS Page 2 of 2 # dazy6, 73 o o/c)--z/ l ' 1 `� - - -- -- - ,..„.0 ! �� j °� \`, - 4 _ o'� - .:R . — • S ; ^ mil - „.„ (,fit 14 J _ 2 - !!_ - 7 4 f : , , s : 0.,, / 1 4 ' l